BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lake Kiowa, Texas. Completed plans call for site work for a water / sewer project.

Instructions to Bidders, Proposal Forms, Specifications, Plans and Contract Documents, etc. may be examined without charge at the office of the Greater Texoma Authority, Texas, 5100 Airport Drive, Denison, Texas 75020, or downloaded from CivCast. The Project consists of: o Replacement of approximately 27,000 LF of asbestos cement (AC) water mains and services with high density polyethylene (HDPE) pipe by a combination of pipe bursting, horizontal directional drilling and open trench methods; all mains are in the public r.o.w. and portions of the service connections are on private property. o Installation of new fire hydrants, fire hydrant service lines and water appurtenances. o Abandoning (in place) portions of the existing AC mains that are to be replaced as part of this Project. A certified check or bank draft payable to the Greater Texoma Utility Authority or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, handicap, age or national origin. Any contracts awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of P.L. 113-76 Consolidated Appropriations Act, 2014. This contract is subject to the Environmental Protection Agency's (EPA) "fair share policy", which includes EPA-approved "fair share goals" for Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) firms in the Construction, Supplies, Equipment, and Services procurement categories. EPA's policy requires that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements, to Minority Business Enterprise and Women-Owned Business Enterprise firms. Although EPA's policy does not mandate that the fair share goals be achieved, it does require applicants and prime contractors to demonstrate use of the six affirmative steps. The current fair share goals for the State of Texas are as follows: CATEGORY MBE WBE CONSTRUCTION 12.94% 8.72% SUPPLIES 9.68% 9.34% EQUIPMENT 7.12% 5.39% SERVICES 10.84% 5.72% The Greater Texoma Utility Authority reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by GTUA for a period not to exceed 60 days from the date of the bid opening for the purpose of receiving bids and investigating the bidder's qualifications prior to the contract award. 1. The contract will be contingent upon release of funds from the Water Development Board 2. Any contract or contracts awarded under this Invitation for Bids are expected to be funded in part by a loan from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies, or employees are or will be a party to this Invitation for Bids or any resulting contract. 3. Equal Opportunity in Employment - All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, handicap, age or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60. Replacement of approximately 27,000 LF of asbestos cement (AC) water mains and services with high density polyethylene (HDPE) pipe by a combination of pipe bursting, horizontal directional drilling and open trench methods; all mains are in the public r.o.w. and portions of the service connections are on private property. Installation of new fire hydrants, fire hydrant service lines and water appurtenances. Abandoning (in place) portions of the existing AC mains that are to be replaced as part of this Project. The Engineer's opinion of construction costs is: $4,151,525.00 The deadline to ask questions is 3/11/2022 12:00 PM CST

Award

Water / Sewer

$3,752,165.00

Public - City

Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
347
Active Projects
198
Bidding Soon
4,552
All Active Projects
1,733
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 15, 2022

May 16, 2022

November 7, 2023

img_map_placeholder

Multiple Locations, Lake Kiowa, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.