Demolition, site work and renovation of a water / sewer project in Miami, Florida. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
The project consists of furnishing all materials, labor, and equipment necessary to complete the following work as shown in the Drawings and Specifications: 1. Demolition and bypass of existing sodium hypochlorite piping located on the South side of Sodium Hypochlorite Day Tank No. 2 located on the 1st floor. 1. Demolition and bypass of suction and discharge piping associated with NaOCl Feed Pumps No. 2 thru No. 7. 2. Demolition and bypass of the NaOCl Dilution/Transfer suction and discharge piping. 3. Demolition and bypass of the potable water pipeline. 4. Demolition of existing pipe supports. 5. Demolition and bypass of electrical conduit and wiring. 6. Salvage and reinstallation of the flow meter, instrumentation and flanged/screwed valving. 2. Demolition and bypass of sodium hypochlorite piping located on the South side of the Sodium Hypochlorite Day Tank No. 2 located on the 2nd floor. 1. Demolition and bypass of the NaOCl discharge piping. 2. Demolition of existing pipe supports. 3. Demolition and bypass of electrical conduit and wiring. 4. Salvage and reinstallation of the instrumentation and flanged/screwed valving. 3. Demolition of sodium hypochlorite piping located on the North side of the Sodium Hypochlorite Day Tank No. 2 located on the building exterior. 4. Repair and rehab of Sodium Hypochlorite Day Tank No. 2 exterior and interior 1. Removal of existing interior/exterior coating. 2. Partial demolition of selected concrete surfaces of the tank interior and exterior. 3. Repair of all demolished concrete surfaces. 4. Application of new coating system and installation of new tank liner. 5. Reinstallation of sodium hypochlorite piping back into its permanent location on the Sodium Hypochlorite Day Tank No. 2 as shown on the As-Builts. 1. Reinstallation of salvaged flow meter, instrumentation and flanged/screwed valving. 2. Reinstallation of Hydrogen Dilution Blowers No. 3 and No. 4. 3. Installation of new pipe supports, as shown on the Drawings. 6. Miscellaneous Items: 1. Relocation of NaOCl Day Tank No. 2 leak detection sensor. The project includes, but is not limited, to make all necessary demolition, repair/rehab and modification work; furnishing and installing all electrical and control equipment associated with mechanical work including electrical controls and associated conduit, wiring, and switches; repair, patch and finish to match existing; coordinating the structural, mechanical and electrical work with the other trades involved; and all other appurtenant and miscellaneous items and work for a complete, satisfactory and functional installation of the project located on South District Wastewater Treatment Plant at 23300 SW 88 Ave, Miami, Florida, 33190. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work. Contract No: MCC 7360 Plan - CICC 7360-0/08, 2018.0819.0 RPQ No: P0265
Post-Bid
Water / Sewer
$2,402,663.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2022
May 15, 2022
23300 SW 88th Ave, Miami, FL
Related To This Project
Miami, FL
Bid Date: Mar 16 2022
Miami, FL
Bid Date: Apr 13 2022
Miami, FL
Bid Date: May 09 2022
Miami, FL
Bid Date: Apr 21 2022
Miami, FL
Bid Date: Apr 12 2022
Miami, FL
Bid Date: May 13 2022
Miami, FL
Bid Date: May 13 2022
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: May 13 2022
Miami, FL
Bid Date: Aug 26 2020
Miami, FL
Bid Date: Apr 27 2022
Miami, FL
--
Miami, FL
Bid Date: May 06 2022
Miami, FL
Bid Date: May 10 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.