BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work, paving and outdoor lighting for a mixed-use development in Oak Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Village Consist of Installation and Maintenance of Oak Park Reserves the Right to Issue Of Detour, Earth Excavation, Sewer Main Plans and Specifications Only to Those And Sewer Lateral Replacement, Catch Contractors Deemed Qualified. No Bid Basins, Manholes, Fire Hydrants, Valves, Vaults, Water Mains, Water Laterals, Lead on the Working Day Preceding the Date Water Laterals, Rain Gardens, Systems, Curb and Gutter, Sidewalk The Work to Be Performed Pursuant to Removal and Reinstallation, Roadway Milling and Hma Overlay, Pavement Irrigation of Patching, Decorative Paver Installations, Et Seq. Tree and Plant Removal and Installation, Traffic Signal Removal and Installation, The Village of Oak Park Streetlight Removal and Installation, Bill Mckenna Pavement Markings, Decorative Lighting, Ev Chargers, Art Installations, Fiber Village Engineer Optic Cable, Specialty Signage; and All Appurtenant Work Thereto. The project is located on Oak Park Avenue in the Village of Oak Park, Cook County, beginning at Randolph Street extending north 2,498 feet (0.47 miles) to Ontario Street, with a net length of 2,414 feet (0.46 miles). There is an omission of 84 feet from the project at the Lake Street intersection; South Boulevard beginning at Grove Street, extending east 526 feet (0.10 miles) to the east of the Oak Park Avenue Intersection; North Boulevard beginning at the Alley West of Oak Park Avenue, extending 340 feet (0.06 miles) to the east of the Oak Park Avenue Intersection; Hunter Court Alley beginning at the alley west of Oak Park Avenue, extending 312 feet (0.06 miles) to the North/South Parking Garage Alley; The North/South Parking Garage Alley beginning at North Boulevard, extending 291 feet (0.06 miles).The overall net length of the project is 3,883 feet (0.74 miles). Description: In general, the work consists of installation and maintenance of detour, earth excavation, sewer main and sewer lateral replacement, catch basins, manholes, fire hydrants, valves, vaults, water mains, water laterals, lead water laterals, rain gardens, irrigation systems, , curb and gutter, sidewalk removal and reinstallation, roadway milling and HMA overlay, pavement patching, decorative paver installations, tree and plant removal and installation, traffic signal removal and installation, streetlight removal and installation, , pavement markings, decorative lighting, EV Chargers, Art Installations, Fiber Optic Cable, specialty signage, and all additional collateral work necessary to complete the project as shown on the plans and as described herein and all appurtenant work thereto. Any questions regarding compliance with these requirements should be directed to: Finance Department, Village of Oak Park, 123 Madison Street, Oak Park, Illinois 60302; 708-358-5460

Award

Roads / Highways

$18,464,983.00

Public - City

Outdoor Lighting, Paving, Site Work

241

7

31

4

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
459
Active Projects
251
Bidding Soon
3,353
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

January 2, 2026

Project location map

Oak Park Ave, Oak Park, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.