Renovation of a mixed-use development in City of Wilkes Barre, Pennsylvania. Completed plans call for the renovation of a medical facility.

*Contract Award Date: Jun 21, 2022 Contract Award Number: 36C24422C0026 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: RHDSJJX1JL85 Contractor Awarded Name: RLS CONSTRUCTION GROUP, LLC Contractor Awarded Address: CAMP HILL, PA 17011 Base and All Options Value (Total Contract Value): $663800.00000000 SCOPE OF WORK Replace Roof Building 27 February 2022 Project # 693-22-101 ROOF #34 1. This project consists of replacing approximately 20,000 square feet of roofing on Building 27 at the Wilkes-Barre VA Medical Center. 2. The Project will include (but not limited to) the following work for each roof: a. Provide all labor, equipment and materials to install the new roof system over the prepared substrate. b. Contractor shall supply Safety plan. c. Contractor shall comply with ICRA, keeping the interior area clean from there entre on the roof to the loading dock area. d. Contractor shall supply a shop drawing of the roofing system to show water flow. e. Remove the existing roofing smooth BUR w/coating system roof down to existing concrete/medal decking. Only as much roofing will be removed as can be replaced in the same day. The removal of all debris from the roof and the ground, daily. f. Remove all obsolete vents, units and penetrations from the roof area and repair accordingly. (As needed) g. Repair all areas of concrete/metal decking that require patching. h. Install a 60-mil 0.35(1.71) Ethylene Propylene Diene Terpolymer (EPDM) Membrane. Shall sustain 90MPH winds. Submit specific materials for a 90mph VERSIGARD Roofing Product, roofing system. The roofing shall be installed by a Certified VERSIGARD Installer. i. Installer specified products with satisfactory service on five similar installations for a minimum five years. Project experience list shall provide contacts names and addresses for completed projects. j. Fabricate and install new pressure treated wood blocking and aluminum gravel stop at roof perimeter. (As needed) k. Cut into existing reglet at the rising walls where applicable. Fabricate and install new copper counter flashing. l. Roof shall have positive drainage to roof drains. There shall be no standing water. Roof Crickets shall be constructed to divert water away from the from penthouses to the roof drains. m. Roofing contractor shall conduct flood test by plugging the drains and fill the roof with water. To check for leaks. n. Replace all (18) roof drains. Size of new drains to match existing. This is a full replacement of the drains. The drain shall be completely removed to the closet coupling beneath the roof. The drain shall be clamped to the concrete/metal decking. o. Fabricate new copper or lead flashings to all pitch pockets and fill with pourable sealer. p. Fabricate new lead flashings to all vent/heat stacks and overflow scuppers. All piping shall be extended at least 14" past the roof the finish roof. all piping material shall be metal, same size as existing piping. (no PVC piping) q. All items moved or disturbed during construction will be returned to the original location/condition. r. Provide all construction layouts and details for VAMC review and approval. s. Remove all job-related debris from the premises daily. t. Lightning protect will be updated to newest code's and recertified. u. Roof shall have a twenty-year Manufacturer's NDL (no dollar Limit) warranty to be provided by roof manufacturer. The Twenty-year warranty shall be the whole TOTAL SYSTEM WARRANT, that shall consist of roofing materials, flashing, all other metal components and Labor for all work. v. They shall be a safety rail installed on the top of the exterior and interior parapet wall. The total height shall be no less than 42" with the combination parapet wall and safety rail. (Approximately 1000ft, contractor verify length) w. They shall install 2 rows of Bird Spikes to the top of the parapet walls they shall be fastened down to the top and shall with-stand 90mph winds. (Approximately 2000ft, contractor verify length) x. All metal caps and all other metal components shall be able to withstand 90mph winds. y. All crane activity shall be conducted on weekends only. z. All in-take ducts shall have Charcoal filters over the openings to contain the debris and smells from the roofing project. aa. If a patient area is affected by the Noise, Smell, Debris or any other factors, the VA COR can alter the work schedule to be performed afterhours and weekends. The contractor shall abide by all federal, state, and local code/regulations/standards shall be followed. Worksite is located on the second and eight floor of the Wilkes-Barre VAMC, 1111 East End Boulevard, Wilkes-Barre, PA 18711. All work will perform during normal business hours 8:00AM to4:30PM Monday to Friday excluding national holidays. a) Bidding materials consisting of drawings, specifications and contract forms may be obtained by qualified General (Prime) Contractors interested in submitting bids direct to the Department of Veterans Affairs from www.betasam.gov (b) Subcontractors, material firms and others interested in preparing sub-bids may obtain a list of Prime Contractors from www.betasam.gov via the Interested Vendors Section. (c) A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then. (d) If the contract will exceed $150,000 (see FAR 28.102-1 for lesser amount), the bidder to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Specification. The scope of work shall generally consist of, but not necessarily be limited to, providing all labor, materials, tools, equipment, permits, testing, inspections and reports required to install a new roof system over the prepared substrate of Building 27 at the Wilkes-Barre VA Medical Center. replace the underground fuel oil storage tank system for the boiler plant at the Wilkes-Barre VA Medical Center as defined by the drawings and specifications. Magnitude of Construction: Between $1,000,000.00 to $5,000,000.00 The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (b) An organized site visit has been scheduled for-- March 24, 2022 2:00 PM Local (c) Participants will meet at-- Rm C6-70 Bldg 1 WBVAMC *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Medical

$663,800.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Glass Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Sheathing, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Roof and Deck Insulation, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Glazing, Glass Glazing, Glazing Accessories
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Foodservice Equipment, Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Rugs and Mats
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Storm Drainage Utilities, Culverts
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
117
Bidding Soon
1,503
All Active Projects
672
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2022

July 5, 2022

img_map_placeholder

1111 East End Blvd, City of Wilkes Barre, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace Roof Building #27

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.