BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Bakersfield, California. Completed plans call for site work for a water / sewer project.

22000 Replacing existing sewer main with 8-inch PVC SDR-35 pipe, tie-in into existing manholes, adjusting manhole frame and cover, and installing new manholes Liquidated Damages: $2,000.00 Per Work Day Bid Bond Percentage: 10% Project Duration: 65 Work Days Engineer's Estimated Cost: $995,500 Pre-Qualification for Bidders: Not Required License Type Required: A or C-34 The successful bidder must furnish a Performance Bond and a Payment Bond each in the amount of 100% of the contract price. Contractor shall achieve contract completion of the entire work within 65 working days from the Commencement Date.

Bid Results

Water / Sewer

$906,268.00

Public - County

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
71
Bidding Soon
702
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2022

April 15, 2022

Project location map

Multiple Locations, Bakersfield, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.