BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2023 at 7:00 PM

Updated January 25, 2024

Site work and renovation of a civil project in Douglasville, Georgia. Completed plans call for site work for a bridge / tunnel; for the renovation of a water / sewer project; and water / sewer project.

As of August, 2022, construction is underway and is expceted to take one year to be completed. No further inquiries to be accepted. Invitation for Bids for Cobb Tunnel Sewer Connection for Douglasville - Douglas County Water and Sewer Authority 8763 Hospital Drive Douglasville, Georgia 30134 February 16, 2022 IFB # 254 The Douglasville - Douglas County Water and Sewer Authority (hereafter referred to as the "Authority") is soliciting competitive sealed bids from qualified contractors for the performance of the Cobb Tunnel Sewer Connection Project (the "Project"), as more fully described in the Invitation for Bids. The scope of work includes the provision by the Contractor of all labor, materials, equipment, tools, transportation, and supplies necessary to complete the work. The Project will be "turn key" and require minimal involvement of Authority personnel. The work to be performed shall include improvements to Blairs Bridge Lift Station consisting of adding a flow meter, motorized plug valves, manual valves, pump header replacement, precast concrete meter vault, replacing a soft start for one pump with a WSA-provided VFD, and associated electrical/control to support the improvements; bypass pumping system operating during lift station improvements; laying approximately 11,600 linear feet of 16-inch HDPE force main; trenchless construction with 36-inch diameter casing; addition of air/vacuum release valves and vaults; 30-inch diameter DIP gravity main into Cobb County Water System sewer tunnel structure; and all associated erosion, sedimentation, and traffic control measures. Special Conditions and Appendices contain more detailed information on the project scope. The Authority will purchase and provide all HDPE pipe for the Project. Special Conditions and Appendices contain more detailed information on the Project scope. Questions shall be submitted no later than 2:00 p.m., local time, on Wednesday, March 16, 2022. Questions shall be submitted to Chas Goblisch at cgoblisch@hazenandsawyer.com. Questions, if answered, will be addressed by Addenda to the Contract Documents. Receipt of any Addenda or amendment to his Advertisement for Bids shall be acknowledged, in writing, and shall be submitted with the Bid. *This project has been awarded and all trades have been let.

Under Construction

Water / Sewer

$6,407,915.00

Public - County

Renovation, Site Work

50

23

6

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
188
Bidding Soon
2,223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2022

August 1, 2022

Project location map

To Be Determined, Douglasville, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.