Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2022 at 8:00 PM

Updated April 9, 2025

Remodeling and renovation of a mixed-use development in Austin, Minnesota. Completed plans call for the remodel of a educational facility; for the renovation of a educational facility; office development; and office development.

Project Scope: Two separate bids composed of the following, and other Work indicated in the drawings and specifications: 1. District office renovation with new finishes and room configurations. 2. Modification at portion of main level IMC and second floor infill at existing IMC multi-story space. Location- 301 3rd St NW Austin, MN 55912 Thursday, June 2, 2022 Estimated commence construction date. Friday, August 26, 2022 Substantial completion Friday, September 2, 2022 Final Completion

Post-Bid

Office

$260,000.00

Public - City

Remodeling, Renovation

42

22

16

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
34
Bidding Soon
479
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

June 2, 2022

Project location map

301 3rd St NW, Austin, MN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed