BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Morrisville, North Carolina. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The scope of work involves complete concrete reconstruction of the taxilane that serves the North Cargo Apron, which is occupied by FedEx and UPS. The taxilane is comprised of concrete pavement and is approximately 2,600 ft long and 80 ft wide. The connection of the taxilane to Taxiway J will require geometric updates per requirements of the Federal Aviation Administration. The area of reconstruction is generally depicted in Exhibit B, attached hereto. The project also includes construction of new taxiway shoulders, replacing or reusing taxiway edge and in-pavement lights, and taxiway signs. Other elements of the work include miscellaneous drainage pipe and grading improvements, turf restoration, and pavement markings. Construction will be phased and sequenced to accommodate the ongoing operations of the Cargo Carriers. Additionally, certain work elements may be required to be performed during nighttime hours and/or weekend days. The contract will specify completion of work in phases with various durations. The estimated construction cost for each project is between ten million dollars ($10,000,000) and twenty million dollars ($20,000,000). Funding for the projects may include grants from the Federal Aviation Administration and the State of North Carolina, the requirements of which will be incorporated into the plans and specifications for the work. All questions regarding the prequalification documents or the projects must be submitted in writing to jim.novak@rdu.com, Attention: Mr. Jim Novak, Director of Facilities Engineering, by 2:00 p.m. local time on March 15, 2022. All questions and responses to questions will be posted on www.rdu.com under "RDU Business"/"Business Opportunities" and will not be available through other means or sources. Oral questions will not be accepted or responded to. The Raleigh-Durham Airport Authority will not be responsible for any answers other than those issued in the form described above. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Transportation Terminals

$20,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
116
Bidding Soon
1,672
All Active Projects
685
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 29, 2022

August 1, 2022

img_map_placeholder

John Brantley Blvd, Morrisville, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.