EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Erie, Pennsylvania. Completed plans call for the renovation of a educational facility.

A stipulated sum bid will be required for 07 52 16 Roofing. Bids shall be submitted in duplicate and mailed or delivered in a sealed opaque envelope clearly marked on the face of the envelope the words Montessori Regional Charter School Natatorium Roof Replacement. If the bid is mailed, the envelope containing the bid shall be enclosed in a separate envelope with the words Sealed bid Enclosed for MRCS Natatorium Roof Replacement Project endorsed on the face thereof. The Pennsylvania Department of Labor and Industry has issued a Prevailing Wage Determination for this project which must be complied with. Prior to submitting a bid, each bidder must file an executed Electronic Document Disclaimer form which will be part of the bid documents. Hard copies will be sold for a non-refundable amount of the cost to produce the documents. Requirements with regard to completion portions of the work are contained in the Project Manual. Montessori Regional Charter School reserves the right to reject any or all bids and the right to waive irregularities in the bids.

Post-Bid

Swimming Pools

$219,000.00

Public - City

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Covered by Contract Documents, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Membrane Roofing, Joint Protection, Joint Sealants
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Assembly and Testing Equipment, Applicators

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
116
Bidding Soon
1,284
All Active Projects
584
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2022

May 2, 2022

img_map_placeholder

2549 W 8th St, Erie, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Montessori Regional Charter School Natatorium Roof Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.