Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Collinsville, Illinois. Completed plans call for site work for a water / sewer project.
**As of December 15, 2022, this project has been awarded to JP Burns Excavating, Inc., in the amount of $304,327.61. The work consists of furnishing all labor, equipment, electric power, and traffic control to accomplish the work in accordance with specifications for the installation of 1,710 ft of storm sewer and appurtenances along Watt St., S. Combs Ave. from Watt St. to Maple St., and Maple St. from S. Combs Ave. to St. Louis Road. The City will be responsible for supplying all materials, trucking for rock, and restoration. As an alternate the City will also provide all trucking related to removal of all excavated materials. All work must be constructed in accordance with the City of Collinsville Code of Ordinances and specifications listed within bid documents. All bids must be made on the forms furnished by the City, and the entire set of documents submitted intact. Incomplete bid submittals will not be considered. All proposals must be accompanied by a bid bond on the form contained in the proposal, bank cashier's check, bank draft, or certified check, payable to the City of Collinsville, for not less than five percent (5%) of the amount of the bid. The successful bidder shall execute a contract bond, required to pay not less than the Prevailing Wage Rates, and enter into a Project Labor Agreement. The City of Collinsville reserves the right to not open a sole bid and to waive, or not to waive, any irregularities in the bids and to determine which is the lowest and best responsible bid. Direct all questions concerning this proposal to Kevin Madden, Associate Engineer, at 618-346-5211, ext 2116 or by email at kmadden@ollinsvilleil.org. Each bid shall be placed in a sealed envelope endorsed "2022 Concrete Replacement Program, Project, CIP #M021-310. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. The proposed project limits begin at the intersection of St. Louis Road and Maple Street, head east along Maple Street to the intersection of Maple Street and South Combs Avenue, then northeast along South Combs Avenue to the intersection of Watt Street and South Combs Avenue; finally heading east on Watt Street to where the project ends. The project scope consists of excavation and construction/installation of the proposed storm sewer consisting of 360-LF of 12-IN RCP; 485-LF of 24-IN RCP; 855-LF of 30-IN RCP; seven 4-FT diameter manholes; nine inlets; the removal of concrete sidewalk, curb and gutter; the removal of asphaltic concrete; and all incidental and collateral work necessary to complete the work described above according to the plans, specifications, and special provisions. Pavement or appurtenances shall not be removed that do not lay within the approved trench limits, that is required to be excavated for the installation of the proposed storm sewers, manholes and inlets. During construction, any damages to sidewalks, street pavement, private driveways, and combination curb and gutter located outside the edges of the approved trench limits shall be the responsibility of the Contractor to replace.
Award
Water / Sewer
$304,328.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 6, 2022
January 17, 2023
St Louis Rd, Collinsville, IL
Related To This Project
Collinsville, IL
Bid Date: Dec 07 2022
Collinsville, IL
Bid Date: Dec 16 2022
Collinsville, IL
Bid Date: Apr 25 2022
Collinsville, IL
--
Collinsville, IL
Bid Date: May 13 2022
Collinsville, IL
--
Collinsville, IL
Bid Date: May 13 2022
Collinsville, IL
Bid Date: May 13 2022
Collinsville, IL
Bid Date: Dec 06 2022
Collinsville, IL
--
Collinsville, IL
Bid Date: Nov 07 2022
Collinsville, IL
Bid Date: Nov 16 2022
Collinsville, IL
Bid Date: Nov 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.