Site work, asbestos abatement and renovation of a civil project in Bentonville, Arkansas. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; and for asbestos abatement for a water / sewer project.

The project is generally described as follows: The improvements generally include increasing the average daily treatment capacity from 3.6 million gallons per day (MGD) to 7.2 MGD (including peak flows of 18 MGD), expanding the influent pump station, new primary clarifier, additional screening and grit removal, new mixing and splitter box, additional process trains, new final clarifier splitter box, additional final clarifiers, expanded return sludge pumping station, additional chemical storage, additional filtration, additional ultraviolet disinfection, Class B solids improvements with new aerobic digesters, additional dewatering within the existing dewatering building, new maintenance facility, and new backup power generation. Pre-Qualification - Yes The completed Work will provide Owner with various wastewater treatment plant improvements. More specifically, the Project includes, but is not limited to, construction of the following: 1. The expansion from 3.6 MGD to 7.2 MGD will require expansions of almost every facility at the NACA WWTP. The 7.2 MGD expansion improvements include: a. Influent Pump Station: 1). Construct a new splitter box structure upstream of the influent pump station. 2). Construct a new add-on wet well to include two additional identical pumps. 3). Install one additional pump in the existing empty bay. b. Screening Facility: 1). Install a new identical mechanical continuous belt screen in the existing manual bar screen channel. 2). Relocate manual bar screen to a fourth channel constructed outside the building. 3). Install a new magnetic flow meter for influent flow measurement in the yard. c. Grit Removal System: 1). Construct two additional 6.8 MGD vortex grit chambers 2). Replace the existing grit classifier with a new four-cyclone grit classifier capable of receiving and classifying grit slurry from 4 grit pumps. The new grit classifier will receive grit flow from four (2 existing + 2 new) grit chambers. d. Primary Treatment: 1). Construct one 96-ft circular primary clarifier. e. Process Train: 1). Construct a new splitter box to distribute flow evenly between four process trains (two existing + two new). 2). Construct two additional process trains with turbine aerators to mirror the existing process trains. f. Alum Storage and Feed: 1). Demolish existing 6,000-gal storage tanks. 2). Construct two new heat-traced outdoor storage tanks. 3). Install new metering feed skids. g. Secondary Clarifiers: 1). Construct a new splitter box to distribute flow evenly between four secondary clarifiers (two existing + two new clarifiers). 2). Construct two new 80-ft diameter circular secondary clarifiers. h. RAS/WAS Pump Station: 1). Add a fourth influent bay to the existing wet well. 2). Add a third 5.4 MGD return activated sludge (RAS) pump. i. Filtration Expansion: 1). Construct a new filtration structure including a. Coagulation/flocculation basins b. Cloth media disk filters 2). Install three new cloth media disk filter systems together with backwash pumps and piping.

Bid Results

Water / Sewer

$74,338,000.00

Public - City

Asbestos Abatement, Renovation, Site Work

2363

108

67

7

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
79
Bidding Soon
967
All Active Projects
442
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 2, 2022

July 4, 2022

December 20, 2024

img_map_placeholder

Multiple Locations, Bentonville, AR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.