Renovation of a municipal facility in Hillsboro, North Dakota. Completed plans call for the renovation of a municipal facility.

The project bid includes the conversion of the existing steam boilers from fuel oil to natural gas. The two (2) existing fuel oil boiler burners will be replaced with natural gas fired boiler burners. This work includes the installation of natural gas service to the courthouse. Modifications, to correct deficiencies, will be made to the existing steam and condensate piping. The existing simplex steam condensate pump will be replaced with a duplex pump. New Category III flue venting will be installed inside the existing masonry chimney as the existing chimney for the boilers is not code compliant for natural gas fired heating equipment. There is no anticipated general construction work and all work associated with this Bid Package will be performed through a single prime contract. All miscellaneous associated work such as project scheduling, project coordination, and final cleaning shall be performed by the Mechanical Contractor. Project Schedule: Substantial Completion September 30, 2022. Bid Security: That each bid must be accompanied by a separate envelope containing the contractor's license and bid security. The bid security must be in a sum equal to five percent of the full amount of the bid and must be in the form of a bidder's bond. A bidder's bond must be executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and the contract awarded to the principal, the principal, within ten days after notice of the award, shall execute a contract in accordance with the terms of the bid and the bid bond and any condition of the governing body. A countersignature of a bid bond is not required under this section. If a successful bidder does not execute a contract within the ten days allowed, the bidder's bond must be forfeited to the governing body and the project awarded to the next lowest responsible bidder. North Dakota Law: o That a bidder, except a bidder on a municipal, rural, and industrial water supply project using funds provided under Public Law No. 99-294 [100 Stat. 426; 43 U.S.C. 390a], must be licensed for the full amount of the bid as required by sections 43-07-05 and 43-07-12. For projects using funds provided under Public Law No. 99-294 [100 Stat. 426; 43 U.S.C. 390a], the advertisement must state that, unless a bidder obtains a contractor's license for the full amount of its bid within twenty days after it is determined the bidder is the lowest responsible bidder, the bid must be rejected and the contract awarded to the next lowest responsible bidder. o That no bid may be read or considered if the bid does not fully comply with the requirements of North Dakota Century Code Chapter 48-01.2 and that any deficient bid submitted must be resealed and returned to the bidder immediately. o That the governing body reserves the right to reject any and all bids and rebid the project until a satisfactory bid is received. The Owner: The Owner reserves the right to hold all bids for a period of thirty days after the date fixed for the opening of bids, and to reject any and all Bids and waive any formalities or irregularities. About Remove letter accents tool

Post-Bid

Municipal

$150,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
10
Bidding Soon
99
All Active Projects
42
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2022

April 1, 2022

img_map_placeholder

114 W Caledonia Ave, Hillsboro, ND

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.