BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bloomington, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Nicollet Avenue (CSAH52) is degrading and in need of a full reconstruction that will provide a new roadway surface in addition to upgraded (ADA compliant) pedestrian sidewalks. The project is split into two phases--Phase 1 will construct the segment from American Boulevard to 89th Street in 2027 while Phase 2 will construct from north of 91st Street to Old Shakopee Road in 2028. Multimodal strategies such as pedestrian crossing enhancements (curb extensions, raised medians and crossing beacons), bikeway accommodations, and streetscaping features will also be consided in an effort to benefit multimodal users. The existing road was last reconstructed in 1962 and is nearing the end of its useful life and warrants replacement. Hennepin County provided the draft capital budget estimates for this project and applied the 2019 cost participation policy to estimate city vs. county funding responsibilities. The 2020 cost participation policy has been adopted by Hennepin County but was not yet applied to this project. It is not anticipated to change the magnitude of the numbers. The Phase 1 cost estimate (2027 anticipated construction) has been updated. The Phase 2 cost estimate (2028 anticipated construction) has not been updated by Hennepin County yet. Included a PMP Trails funding source in July 2021 after the Franchise Fee Update at Council. As of January 19, 2023, this project is currently in the FY 2023-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$41,426,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
781
All Active Projects
338
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2024

img_map_placeholder

Nicollet Ave, Bloomington, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.