BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Evanston, Illinois. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of May 13, 2022, the project has not yet been awarded. A timeline for award not yet been established. Please contact the Purchasing Department office at 847-866-2935 if you have any questions. Professional engineering services for design of sidewalk and streetlights improvement project on Greenleaf Street and Hartrey Avenue. Work shall include surveying, data collection, public & stakeholder engagement, environmental, geotechnical and civil design services necessary to develop construction plans, specifications and estimates. Improvements will primarily consist of sidewalk gap infills, new sidewalks, and street lighting upgrades The improvement includes two streets as follows: o Greenleaf Street: Grey Avenue to Pitner Avenue o Hartrey Avenue: Greenleaf Street to Greenwood Street Both of these are minor streets servicing residential and commercial usage and are under the jurisdiction of the City of Evanston. There are gaps in the sidewalk network on both sides of the street on Greenleaf Street and on the east side of Hartrey Avenue between Dempster Street and Greenwood Street. The section of Hartrey Avenue from Greenleaf Street to Dempster Street does not have sidewalks on either side of the street. Parking is in high demand and currently the 'parkway area' within the City's Right-of-Way (ROW) is utilized to do so on the east side of the street by the adjacent properties. On the west side, some private fencing/landscaping encroaches on the ROW and there are mature trees as well. The sidewalks need to be constructed to complete the network along with street light improvements in accordance to the City's Streetlight Master Plan guidelines. Design plans are expected to be substantially finalized and completed in 2022 for construction in Summer 2023 The City has a goal of 25% of the contract amount for the participation and utilization of Minority-Owned, Women-Owned, and Evanston-based businesses (M/W/EBEs) in completing a portion of the services required by the City

Post-Bid

Sidewalks / Parking Lot

$2,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
132
Bidding Soon
1,965
All Active Projects
850
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

May 16, 2022

img_map_placeholder

Multiple Locations, Evanston, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.