Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Dallas City, Illinois. Completed plans call for the renovation of a educational facility.
As of January 17, 2024, construction of this project has commenced, however, an exact timeline for construction has not been confirmed. WORK consists generally of interior demolition and remodeling of existing boys and girls toilet rooms, and development of a new staff toilet room from an existing office and a storage room at the Dallas Elementary School, located at 921 Creamery Hill Road, Dallas City, Illinois. A bid guarantee consisting of a bid bond, certified check or cashier's check in the amount of ten percent (10%) of the amount of the Base Bid shall be submitted with each bid and bidder hereby agrees that the proceeds of such bid bond, check or draft shall become the property of the Board of Education, Dallas Elementary School District #327, if for any reason the bidder, within sixty (60) days after official opening of bids, withdraws his bid or if on notification of award refuses or is unable to execute tendered contract and provide an acceptable performance bond within ten days after such tender. Security shall be held only by bid bond issued by surety licensed to conduct business in the State of Illinois, or certified or cashier's check made payable to the Owner. Not less than the prevailing rate of wages as found by the public body or Department of Labor or determined by the court of review shall be paid to all laborers, workmen and mechanics performing work under this bid. See Prevailing Wages for Mercer County available from the State of Illinois, Department of Labor, State Office Building, Room 705, Springfield, IL 62706. Electronic files are available from the Architect for download to all bidders at no cost. A set of contract documents may be examined at the Architect's Office or at: 1. Greater Peoria Contractors & Suppliers, 1811 W. Altorfer Dr., Peoria, IL 61615, info@gpcsa.org (email) 2. ConstructConnect, content@ConstructConnect.com (email) 3. Southern Illinois Builders, 1468 N. Green Mount Road, O'Fallon, IL 62269, projects@siba-agc.org (email) The site of the work is Dallas Elementary School, Dallas Elementary School Dist. #327, 921 Creamery Hill Rd., Dallas City, Illinois. Contractor shall submit proposed project schedule for review by Owner and Architect within two weeks of Award of Contract. Work shall start September 1, 2023. Work shall be substantially complete by August 1, 2024. Owner reserves the right to accept or reject any alternate bid in the sequence of his choice, and to adjust the contract sum accordingly at any time within sixty days after signing of contract. Submit all questions about the architectural drawings and specifications to the Architect. Submit all questions about the M/E/P drawings to the Engineer. Interpretations or corrections will be issued as Addenda. The Architect and Owner will not be responsible for oral clarification. Questions received less than seventy-two hours before the bid opening cannot be answered. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.
Under Construction
Educational
$332,461.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 27, 2023
September 1, 2023
921 Creamery Hill Rd, Dallas City, IL
Related To This Project
Dallas City, IL
Bid Date: Jul 07 2022
Dallas City, IL
Bid Date: Dec 01 2022
Dallas City, IL
Bid Date: Sep 22 2023
Dallas City, IL
Bid Date: Dec 01 2021
Dallas City, IL
Bid Date: Dec 08 2021
Dallas City, IL
Bid Date: Mar 31 2022
Dallas City, IL
Bid Date: Jun 22 2022
Dallas City, IL
--
Dallas City, IL
Bid Date: Mar 16 2022
Dallas City, IL
Bid Date: Mar 16 2022
Dallas City, IL
Bid Date: Dec 01 2022
Dallas City, IL
Bid Date: Nov 09 2022
Galesburg, IL
Bid Date: Apr 20 2022
Milledgeville, IL
Bid Date: Mar 30 2022
Quincy, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.