BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Flint, Michigan. Completed plans call for the renovation of a educational facility.

Email Contact for Questions: rfpsubmission@flintschools.org Any inquiries or requests regarding clarification of this RFP document shall be submitted to the buyer in writing. Offerors may contact ONLY the buyer regarding the terminology stated in the procurement documents. Name Latisha Wolf Phone Number 810-767-6188 E-Mail rfpsubmission@flintschools.org Flint Community Schools is accepting proposals for the procurement of materials and installation of parts on a boiler. Our boiler is currently working; however, the boiler is not performing at maximum capacity. This RFP is to secure parts and labor to bring the boiler to maximum capacity. We are not looking to replace the boiler, only make minor repairs. Please ensure labor cost and removal cost of any parts (if applicable) is articulated in the RFP proposal. Vendors will also need to include a lead time for the parts or identify if the vendor has the parts on hand to perform the work. Warranty information should be included in the RFP proposal if applicable. Flint Community Schools is accepting proposals for the procurement of materials and installation of parts on a boiler. Our boiler is currently working; however, the boiler is not performing at maximum capacity. This RFP is to secure parts and labor to bring the boiler to maximum capacity. We are not looking to replace the boiler, only make minor repairs. Please ensure labor cost and removal cost of any parts (if applicable) is articulated in the RFP proposal. Vendors will also need to include a lead time for the parts or identify if the vendor has the parts on hand to perform the work. Warranty information should be included in the RFP proposal if applicable. Currently the district believes the following parts and labor are needed to sustain/maintain the boiler: o Piping o Fittings o Valves o Insulation o Expansion Joint Replacements o Pumps o Motors (include size on response) o Heat Exchanger o Labor The list above is not an all-inclusive list needed. Vendors must attend the Mandatory Pre-bid meeting to inspect the unit and develop a detailed list of materials, labor and identified repairs. The Director of Facilities will be present to discuss the boiler and extent of the project.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
103
Bidding Soon
1,404
All Active Projects
595
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

April 28, 2022

img_map_placeholder

1420 W 12th St, Flint, MI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.