Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Valle Township, Missouri. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.
As of December 14, 2023, per owner, an engineering team has been identified. Design is being finalized and the property acquisition phase is beginning. Advertising for bid in late Fall 2024. Location/Description: Harmony Hills Road Bridge over Pomme Creek Proposed Improvement: Bridge Replacement Length: 0.1miles Consultant Services Required: Roadway: Consultant shall be responsible for professional engineering services including the preparation of preliminary plans, right-of-way and easement plats, final construction plans, technical specifications and construction cost estimation. As part of preparing the plans the consultant may need to perform field surveys, archaeological or environmental studies and geotechnical investigations. The consultant shall also be responsible for a limited number of construction engineering services including staking of new right-of-way corners, setting of pins post-construction, review of shop drawings and material certifications, perform any needed drawing revisions and respond to requests for information from both the Contractor and the County The method of contractor selection has not been determined at this time. MODOT - RFQ Engineering - Harmony Hills Road Bridge Replacement
Design
Bridges / Tunnels
$577,436.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 29, 2024
Harmony Hills Rd, Valle Township, MO
Related To This Project
Valle Township, MO
Bid Date: Sep 12 2023
Kansas City, MO
Bid Date: Feb 25 2022
Kansas City, MO
--
Ballwin, MO
Bid Date: Jan 11 2022
Sedalia, MO
Bid Date: Feb 25 2022
Kansas City, MO
Bid Date: Jun 09 2021
Rolla, MO
Bid Date: Jan 05 2022
Liberty, MO
Bid Date: Feb 25 2022
Lake Saint Louis, MO
Bid Date: Feb 25 2022
Saint Louis, MO
Bid Date: Feb 25 2022
Saint Peters, MO
Bid Date: Feb 25 2022
Kirkwood, MO
Bid Date: Feb 25 2022
Iberia, MO
Bid Date: Feb 25 2022
Columbia, MO
Bid Date: Feb 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.