BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2025 at 8:00 PM

Updated April 11, 2025

Site work and outdoor lighting for a playground / park / athletic field in Wauwatosa, Wisconsin. Conceptual plans call for site work for a playground / park / athletic field.

UPDATE Upgrade the field lighting to LED to improve lighting on the field, reduce energy costs, and replace fixtures well past their useful life. This project will only move forward assuming there are sufficient funds in the Parks Capital Reserve. *Prior budget in 2025 Project is in City of Wauwatosa apital budget fy 2025-2029 CIP ____________________________________________________________________________ UPDATE : https://www.wauwatosa.net/home/showpublisheddocument/5212/638354897645530000 Upgrade the field lighting to LED to improve lighting on the field and reduce energy costs as well as replacement of fixtures well past their useful life. This project will only move forward assuming there are sufficient funds in the Parks Capital Reserve. *Prior budget in 2025 Project is in City of Wauwatosa - Procurement capital budget fy 2024-2028 CIP 127 ____________________________________________________________________________________________________________________________ Upgrade the field lighting to LED to improve lighting on the field and reduce energy costs as well as replacement of fixtures well past their useful life. This project will only move forward assuming there are sufficient funds in the Parks Capital Reserve. *Prior budgeted in 2024 As of February 23, 2023, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$260,000.00

Public - City

Outdoor Lighting, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
184
Bidding Soon
2,082
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

Project location map

7300 W Chestnut St, Wauwatosa, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.