EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 29, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Whitakers, North Carolina. Completed plans call for site work for a water / sewer project.

The OWNER reserves the right to reject any and all BIDS. BIDDER shall be properly licensed under Chapter 87, General Statutes of North Carolina. Small, minority, women's, and disadvantaged businesses and labor surplus area firms are encouraged to submit BIDS This PROJECT is subject to the good faith efforts and goals for participation by minority businesses required by G.S. 143-128.2. The OWNER has adopted a verifiable ten percent (10%) goal for participation by minority businesses in the total value of the WORK BIDDERS shall, within the time frames specified in the BID documents, submit all required affidavits and documentation demonstrating that the BIDDER made the required good faith effort in compliance with G.S. 143-128.2. Failure to file all required affidavits and documentation within the required time frames is grounds for rejection of the BID. Prospective BIDDERS who have been found guilty of discrimination within the last two (2) years are debarred from bidding.

Bid Results

Water / Sewer

$606,299.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application, Erection, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Turf and Grasses, Plugging, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
39
Bidding Soon
964
All Active Projects
412
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2022

May 26, 2022

img_map_placeholder

To Be Determined, Whitakers, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.