Published November 2, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Penn Yan, New York. Completed plans call for the renovation of a water / sewer project.

As of November 2,2022, this project was awarded to Schuler-Haas Electric Corp. with $239,992.00 for Electrical Construction and C.O. Falter Construction with $2,097,101.00 for General Construction. Total awarded amount is $2,337,093.00. The work to be performed consists principally of the furnishing of all labor, and materials for: Construction of UV Disinfection facility, filtration facility and flow monitoring facility along with related building construction, electrical construction and related work. The foregoing is a general outline of work only and shall not be construed as a complete description of the work to be performed under the Contract. Contract documents may be obtained in person at the office of the Engineer listed below in printed form or compact disk (CD) format. Bid documents obtained from third parties are considered informational only and may not be relied upon as complete documents for use in preparing a bid. Plans and Specifications will be mailed from the Engineer's office to prospective bidders upon request, provided that the prospective bidder submits an additional check for $25.00 for each printed copy requested or $10.00 for each CD copy requested payable to Elliott Engineering Solutions for handling and postage, prior to the Plans and Specifications being mailed. Checks for printed Plans and Specifications must be made payable to "Elliott Engineering Solutions" and must be submitted to Elliott Engineering Solutions. Plans and Specifications will not be available or be mailed from the Village of Penn Yan offices.Refunds of payment for one (1) copy of the original printed Plans and Specifications, in good condition, will be made to those submitting a proposal on the forms furnished, if returned within thirty (30) days after award of the contract. There will be no refund to non-bidders. Plans, Specifications, and Proposal forms may be examined at the engineer's office. Proposals must be made in writing on the forms furnished and shall be accompanied by a Bid Guaranty for an amount not less than five percent (5%) of the amount bid in accordance with the INSTRUCTIONS TO BIDDERS. The Village of Penn Yan is exempt under Sections 1116 of the New York State Tax Law, and therefore, no sales tax shall be included in the bid. The successful Bidder will be required to furnish and pay for a satisfactory Performance Bond and a Labor and Material Bond, and provide insurance in accordance with the INSTRUCTIONS TO BIDDERS. The Village of Penn Yan reserves the right to reject any and all bids, and to accept any Proposal or individual item or items which may be deemed most favorable to the Village's best interests. Small and minority firms, women's business enterprise, Section 3, and labor surplus area firms are encouraged to participate. Proposals MUST include the Non-collusive Bidding Certificate And The Sexual Harassment Form. Custom Projects Description --- Bid Results (General Const Portion) CO Falter Construction Corp $2,097,101.00 (Electrical Portion) Schuler-Haas Electric Corp $239,992.00

Award

Water / Sewer

$2,337,093.00

Public - City

Renovation

30

22

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Procedures, Closeout Submittals, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Contaminated Site Material Removal, Underground Storage Tank Removal
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Grouting, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Underlayment, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding, Steel Siding, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Vehicle Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
92
Bidding Soon
1,084
All Active Projects
483
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2022

November 28, 2022

img_map_placeholder

To Be Determined, Penn Yan, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Penn Yan Wastewater Treatment Facility Disinfection Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.