EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2023 at 8:00 PM

Updated October 1, 2024

Demolition, site work and new construction of an educational facility in Westwood, Massachusetts. Completed plans call for the demolition of a 112,888-square-foot educational facility; for the construction of a 113,141-square-foot, two-story above grade educational facility; and for site work for a educational facility.

Sub Bid Deadline 6/8/22 Time 2:00 P.M. Town of Westwood, c/o its Permanent Building Committee, invites Bids from GENERAL & TRADE Contractors. Replacement Paul Hanlon Elementary School. The project is a new-two story, 113,141 GSF elementary school on an existing school campus. The proposed school is located in the woodland behind the existing school. Ledge removal is required to level the building site. The new school is designed for 560 students. categories of work: Masonry, Miscellaneous & Ornamental Iron, Waterproofing, Dampproofing & Caulking, Roofing & Flashing, Metal Windows, Glass & Glazing, Tile, Acoustical Tile, Resilient Floors, Painting, Fire Protection, Plumbing, HVAC, Electrical. The proposed project is located at 790 Gay Street, Westwood, MA and consists of the construction of a new elementary school building for grades K-5 for 560 students, parking lots, access roads and walkways, a soccer field, a little league baseball field, outdoor classroom, and a playground to support the new school building. The project also includes the demolition of the existing Hanlon Elementary School. The project is planned to be a Certified Green School through LEED certification process, and is on track to achieve a minimum of Silver certification and to be Net Zero Energy ready. 1. Approximate area: 112,888 square feet. 2. Estimated project construction cost is approximately $70,300,000. Bid Result. MASONRY: Fernandes Masonry Inc $3,275,000 ORNAMENTAL IRON: V & G Iron Works $978,375 WATERPROOFING:P.J. Spillane Co. Inc. $778,890 ROOFING:Stanley Roofing Company $3,165,000 WINDOWS:Chandler Architectural Products Inc. $2,747,000 GLASS AND GLAZING:Aluminum & Glass Concepts Inc. $49,850 TILE:Capital Carpet & Flooring Specialists Inc. $254,712 ACOUSTICAL TILE:K&K Acoustical Ceilings Inc. $405,300 RESILIENT FLOORS: Pavilion Floors Inc. $710,195 PAINTING: Color Concepts Inc. $303,875 FIRE PROTECTION: Johnson Controls Fire Protection LP $716,300 PLUMBING: Grasseschi Plumbing & Heating Inc. $2,369,000 HVAC: NB Kenney Company $10,263,000

Under Construction

Educational

$26,016,497.00

Public - City

Demolition, New Construction, Site Work

304

37

42

2

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
394
Active Projects
240
Bidding Soon
2,768
All Active Projects
1,289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2022

August 12, 2022

img_map_placeholder

790 Gay St, Westwood, MA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.