Published March 11, 2022 at 7:00 PM
Updated November 15, 2023
Site work for a power facility in Wrangell, Alaska. Completed plans call for site work for a power facility.
The Southeast Alaska Power Agency (SEAPA) is seeking proposals from qualified industrial electric installation contractors to replace the Wrangell Substation SF6 Circuit Switchers, located at Wrangell, Alaska. Work shall be performed during the established outage dates of June 1-10, 2022. The undersigned, acknowledging their familiarity with all parts of the Request for Proposals (RFP), attachments thereto, and any addenda, hereby proposes and agrees to perform all work described under the RFP in a skillful and timely manner, including providing all labor, materials, supplies, tools, equipment, manufactured articles, transportation, and services necessary for refurbishment of the Petersburg Substation as more particularly set forth in the RFP. All work shall be complete, and all work, materials, and services not expressly indicated or called for in the RFP, which may be necessary for the complete and proper fabrication and delivery of the work in good faith, shall be provided by the Contractor as though originally so indicated, at no increase in cost to SEAPA. The Southeast Alaska Power Agency (SEAPA) is seeking proposals from qualified industrial electric installation contractors to replace the Wrangell Substation SF6 Circuit Switchers, located at 1059 Zimovia Hwy approximately 1 mile south of the Wrangell airport. Work shall be performed during the established outage dates of June 1-10, 2022, unless weather or other unforeseen circumstances precludes otherwise. Proposals are due by March 15, 2022 at 4:00 p.m. AKDT. The Wrangell Substation is critical to delivering reliable power to Wrangell. Annual maintenance and 5- year testing performed by SEAPA have maintained reliability and life expectancies. During the 2021 maintenance outage, SEAPA discovered that the Wrangell transformer circuit switcher was low on SF6 gas. After in-house testing to identify the leak, refilling the dielectric (insulating) gas and placing the asset back online, it continued to leak gas. The Circuit switcher has now lost all SF6 gas and is at the end of its useful life.
Post-Bid
Power Plant
$500,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 15, 2022
June 1, 2022
1059 Zimovia Hwy, Wrangell, AK
Related To This Project
Wrangell, AK
Bid Date: Mar 07 2022
Wrangell, AK
Bid Date: Jan 12 2024
Wrangell, AK
Bid Date: Apr 12 2024
Wrangell, AK
Bid Date: May 01 2024
Wrangell, AK
Bid Date: May 09 2024
Wrangell, AK
Bid Date: Feb 16 2022
Wrangell, AK
Bid Date: Dec 06 2021
Wrangell, AK
Bid Date: Aug 29 2023
Wrangell, AK
Bid Date: Jul 12 2023
Wrangell, AK
Bid Date: Jun 30 2023
Wrangell, AK
Bid Date: Aug 11 2023
Wrangell, AK
Bid Date: Jan 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.