BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a power facility in Wrangell, Alaska. Completed plans call for site work for a power facility.

The Southeast Alaska Power Agency (SEAPA) is seeking proposals from qualified industrial electric installation contractors to replace the Wrangell Substation SF6 Circuit Switchers, located at Wrangell, Alaska. Work shall be performed during the established outage dates of June 1-10, 2022. The undersigned, acknowledging their familiarity with all parts of the Request for Proposals (RFP), attachments thereto, and any addenda, hereby proposes and agrees to perform all work described under the RFP in a skillful and timely manner, including providing all labor, materials, supplies, tools, equipment, manufactured articles, transportation, and services necessary for refurbishment of the Petersburg Substation as more particularly set forth in the RFP. All work shall be complete, and all work, materials, and services not expressly indicated or called for in the RFP, which may be necessary for the complete and proper fabrication and delivery of the work in good faith, shall be provided by the Contractor as though originally so indicated, at no increase in cost to SEAPA. The Southeast Alaska Power Agency (SEAPA) is seeking proposals from qualified industrial electric installation contractors to replace the Wrangell Substation SF6 Circuit Switchers, located at 1059 Zimovia Hwy approximately 1 mile south of the Wrangell airport. Work shall be performed during the established outage dates of June 1-10, 2022, unless weather or other unforeseen circumstances precludes otherwise. Proposals are due by March 15, 2022 at 4:00 p.m. AKDT. The Wrangell Substation is critical to delivering reliable power to Wrangell. Annual maintenance and 5- year testing performed by SEAPA have maintained reliability and life expectancies. During the 2021 maintenance outage, SEAPA discovered that the Wrangell transformer circuit switcher was low on SF6 gas. After in-house testing to identify the leak, refilling the dielectric (insulating) gas and placing the asset back online, it continued to leak gas. The Circuit switcher has now lost all SF6 gas and is at the end of its useful life.

Post-Bid

Power Plant

$500,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
5
All Active Projects
1
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2022

June 1, 2022

img_map_placeholder

1059 Zimovia Hwy, Wrangell, AK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.