EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 3, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a road / highway in Atlanta, Texas. Completed plans call for site work for a road / highway.

For Ps&e Package Questions Call: Rebecca Wells 701 East Main St Atlanta, Tx 75551 903/799-1482 Etclength: 25.00mi Time for Completion: 90 Working Days County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Cass0062-04-051at Sh 155 Us 59f 2022(515). Length: 0.50 Miles Marion0062-06-060at Fm 2208 Us 59f 2022(515). Length: 1 Miles Marion0062-06-061at Sh 49 Us 59f 2022(515). Length: 0.50 Miles Harrison0062-07-099at Sl 390 Us 59f 2022(515). Length: 1 Miles Harrison0062-07-100at Poplar St. Us 59f 2022(515). Length: 1 Miles Harrison0062-07-101at Sh 43 N. Us 59f 2022(515). Length: 1 Miles Harrison0062-07-102at Us 80 Us 59f 2022(515). Length: 0.50 Miles Harrison0063-01-097at Houston St. Us 59f 2022(515). Length: 1 Miles Harrison0063-01-098at Fm 31 Us 59f 2022(515). Length: 1 Miles Harrison0063-01-099at Elysian Fields Ave. Us 59f 2022(515). Length: 1 Miles Harrison0063-01-100at Johnson St. Us 59f 2022(515). Length: 1 Miles Harrison0063-01-101at Sh 43 S. Us 59f 2022(515). Length: 1 Miles Harrison0063-01-102at Bell St. Us 59f 2022(515). Length: 1 Miles Panola0063-03-070at Us 79 Us 59f 2022(515). Length: 1 Miles Panola0063-04-066at Fm 699 Us 59f 2022(515). Length: 1 Miles Panola0063-04-067at Sh 149 Us 59f 2022(515). Length: 0.50 Miles Bowie0218-01-101at Fm 989 Us 59f 2022(515). Length: 1 Miles Bowie0218-01-102at Fm 2148 Us 59f 2022(515). Length: 1 Miles Bowie0218-01-103at Sl 151 Us 59f 2022(515). Length: 1 Miles Bowie0218-02-053at Us 82 Ih 369f 2022(515). Length: 1 Miles Bowie0218-02-054at Us 67 Ih 369f 2022(515). Length: 1 Miles Cass0218-04-123at Emma Lena Way Us 59f 2022(515). Length: 1 Miles Cass0218-04-124at Sh 77 Us 59f 2022(515). Length: 1 Miles Cass0218-04-125at Fm 125 Us 59f 2022(515). Length: 1 Miles Camp0248-02-068at Sl 179 Us 271f 2022(515). Length: 1 Miles Cass0278-01-063at Fm 251 Sh 77f 2022(516). Length: 1 Miles Upshur0401-04-039at Fm 49 Sh 154f 2022(516). Length: 1 Miles Bowie0945-01-044at Us 82 Sh 93f 2022(515). Length: Miles TXDOT - US 59 - Upgrade Traffic Signals

Award

Roads / Highways

$504,893.00

Public - State/Provincial

Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 08 - Openings

Division 08 - Openings

Hardware
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
18
Bidding Soon
370
All Active Projects
165
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2022

May 9, 2022

img_map_placeholder

US-59, Atlanta, TX

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

US 59 - Upgrade Traffic Signals

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.