BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 14, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Fish Springs, Nevada. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of April 19, 2022, the project has been awarded. A timeline for construction has not been confirmed. Type: District-2 Contract Cost Range: R21 ($2,200,000.01 to $2,650,000) Funding Type: FEDERAL County(s): DOUGLAS Location: US 50, 0.37 miles West of Warrior Way to 0.22 miles East of Tahoe Drive safety and hydraulic improvements, install infiltration basin and signal Prequalification Required: Y Route(s): US050-1 Milepost(s): DO 4.220 to DO 5.500 Contract Days: 50 (working) Liquidated Damages: $5,400.00 Project Length: 1.0000 mi Stations: "P" 110+68.94 P.O.T. - "P" 177+22.92 P.O.C. NVDOT - Safety and Hydraulic Improvements, Install Infiltration Basin and Signal *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Roads / Highways

$2,628,000.00

Public - State/Provincial

Paving, Site Work

8

9

8

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
0
Bidding Soon
230
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2022

May 23, 2022

Project location map

US 50, Fish Springs, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.