BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Tuolumne, California. Completed plans call for site work for a water / sewer project.

The Project consists of modifications to the TCSD collection system. The section of the collection system is in Tuolumne, California, south of Tuolumne Road North and north of Willow Avenue. The Project will have Base Bid work items and additive bid items. Base Bid items are the following: mobilization and demobilization, installation of 6-inch and 8-inch PVC Pipe, abandon existing pipe, pavement and surface restoration, manhole rehabilitation, abandon existing manholes, install manholes, install cleanouts, abandon existing cleanouts, install trench dams, compaction testing, reconnect sewer services, relocate sewer laterals on private property, install grinder pumps, traffic control, compliance with environmental conditions as established for the project, and all other costs associated with the base bid portion of the project. Additive bid items include A) Gardner; B) North Cedar; C) Madrone; and D) South Cedar. CWSRF required disclosure: Funding for this project has been provided in full or in part through an agreement with the State Water Resources Control Board. California s Clean Water State Revolving Fund is capitalized through a variety of funding sources, including grants from the United States Environmental Protection Agency and state bond proceeds. The contents of this document do not necessarily reflect the views and policies of the foregoing, nor does mention of trade names or commercial products constitute endorsement or recommendation for use. The following list of pre qualified general contractors were accepted and approved by TCSD on Thursday, January 27, 2022. Request for Pre-qualification of Contractors public noticing commenced on December 3, 2021 and ended on January 13, 2022. The Project consists of improvements to the TCSD sewer collection system. The section of the collection system is in Tuolumne, California, south of Tuolumne Road and north of Willow Avenue

Award

Water / Sewer

$4,222,387.00

Public - City

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
50
Bidding Soon
748
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2022

December 3, 2022

img_map_placeholder

Multiple Locations, Tuolumne, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.