Renovation of an educational facility in Charleston, South Carolina. Completed plans call for the renovation of a educational facility.

Replace existing 300-ton water cooled chiller, cooling tower, chilled water pump, and condenser water pump located on the 8th floor of the Basic Science Building at MUSC. Modifications to the existing equipment include relocation and /or re-routing of a portion of the chilled water lines is included. Construction Cost Range: $1M to $1.5M BID SECURITY IS REQUIRED IN AN AMOUNT NOT LESS THAN 5% OF THE BASE BID. The successful Contactor will be required to provide Performance and Labor and Material Payment Bonds, each in the amount of 100% of the Contract Price. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT LOCATION: MUSC Basic Science Building, 173 Ashley Avenue, Charleston SC 29425 A. The overall scope of this project is to replace existing 300-ton water cooled chiller, coolingtower, chilled water pump, and condenser water pump located on the 8thfloor of the BasicScience Building at MUSC. Modifications to the existing equipment include relocation and /orre-routing of a portion of the chilled water lines is included. A more detailed, but not exhaustive,list of scope requirements is shown below. The contractor should review drawings andspecifications carefully to determine the complete scope of the project. B. Removal, demolition, and replacement of exterior walls, louvers, roofs, ceilings, floors,structural steel, slabs, etc. required for the replacement of mechanical and electrical equipment, pumps, piping, control panels, valves, actuators, electrical equipment, conduits, etc. C. Removal of the existing 8thfloor Basic Sciences Building chiller including refrigerantreclamation, associated cooling tower, associated chilled water pump, and associated condenserwater pump. D. Installation of new centrifugal chiller, cooling tower, chilled water pump and tower water pumpwith inertia bases, chilled water and tower water piping systems, valves, and water specialties tocomplete the installation of the new chiller at the Basic Sciences Building.

Post-Bid

Educational

$1,500,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
52
Bidding Soon
519
All Active Projects
260
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

May 16, 2022

img_map_placeholder

173 Ashley Ave, Charleston, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.