EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 1, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Mapleton, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Sanitary Sewer (Gravity), Construction, Sidewalks/Curbs/Gutters, Storm Drain and Paving, Property Development (Residential), Pipe Lining, Street/Roadway Reconstruction , Utility Street Construction and Excavation, Sewer and Water Construction, Street/Road Repairs, Grubbing & Clearing, Stormwater Improvements, Waterlines, Paving (Highway, Road or Street) Common Excavation 8,600 CY 12"-21" Storm Sewer with MH's & CB's 950 LF Remove Bituminous Pavement 2,500 SY 3.5" Bituminous Pavement (8" Agg Base, CL5, 12" Agg Base CL3) 8,400 SY 8" Sanitary Sewer w/Manholes 1,900 LF 4"-6" Perforated & Non-Perf Pipe Drain 7,800 LF 8" Sanitary Sewer Lining 165 LF Concrete Driveway Apron 840 SY 6"-8" Watermain, Valves, Hydrants 2,400 LF B618 Concrete Curb & Gutter 4,900 LF 1" Water Service / 4" San Sewer Service 30 EA Sod / Seeding 5,700 SY *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Roads / Highways

$1,796,208.00

Public - City

Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Field Samples, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Plaques
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Aggregate Surfacing, Planting, Planting Preparation, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
33
Bidding Soon
845
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

April 18, 2022

img_map_placeholder

Multiple Locations, Mapleton, MN


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2022 Street and Utility Improvements-Part 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.