BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Peculiar, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

For this bid, the site is to be considered within the boundaries of the Raymore-Peculiar School District. General Info: Work will take place at many school sites. The unit cost must include any mobilization fees/charges per site. Approximately $135,000 of concrete and pavement repairs will take place in 2023 under this contract. The selected bidder will walk the district-identified sites with district staff to provide hard bids using the unit cost. Bidders may bid for any or all unit costs. Bidders are required to provide certified payroll with the invoice; invoices must match bids, and be submitted by the site. All Concrete to be #4K KCMMB Concrete sidewalk to be considered 4" Concrete Pavement to be considered 8" Prices are to be good from the day of bid opening until November 31, 2023 The unit cost must be valid no matter the scope of work per site. Full Depth repair is to be considered as 8" of pavement. Subgrade removal and replacement are to be considered of 8" of soil, base rock replacement to be 8" of MODOT Type 5. Seal coat to be a 1-squeegee coat and 1-spray coat. Crack seal sealant material shall be a hot pour elastomeric type conforming to the requirements of ASTM D 6690 Type II. The cut-sheets must be sent in with a bid. All cracks wider than 1/4 " are to be sealed. All over banding shall be kept to a minimum. After the sealant has cooled, settling shall not exceed 3/8" below the surface. Work may begin June 1st and must be completed by August 6, 2023 All curb unit costs are to include removal and replacement. All concrete replacement to be dowelled, and rebar installed on 24" E.W. O.C Bidder to supply price deduct per Sq.Ft for new concrete that does not need removal or hauled away. All concrete removal to be hauled off-site and disposed of. All soil removed to be hauled off-site and disposed of. Concrete clean-out bags must be included and must be hauled away. NO CONCRETE CLEAN OUT ON SITE unless more work is coming at the same site. Black dirt backfill, seeding, and seed blanket to be installed by the bidder. Curbs to have 2- #4's Con. Rebar is not epoxy coated Certified Payroll must be submitted with every pay-app, and checked before a check will be issued. Seal-Coating work may have to be split up to allow access to the building at all times. Please Send Questions to Scott Dobson Scott.Dobson@raypec.org (816) 935-1373 The District reserves the right to reject any or all bids and to waive informalities and minor irregularities in bids received, and to accept any or all portions of a bid is deemed to be in the best interest of the District. The Invitation to Bid implies no obligation on the part of the District, and the District's silence does not imply any acceptance or rejection of any bid or quotation offer. The District reserves the right to select a bid with higher prices than the lowest of all prices received if, in the District's opinion, interests will be best served by such bid. Raymore-Peculiar School District shall be the sole judge in determining successful bidder(s) in regard to quality, price, and performance. An insurance form must be provided to the owner with the bid.

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
52
Bidding Soon
741
All Active Projects
313
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2022

June 1, 2023

img_map_placeholder

Multiple Locations, Peculiar, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.