BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Winnipeg, Manitoba. Contact the soliciting agency for additional information.

Reference Number 0000218567 Source ID PU.MU.MB.559625.C105181 Bid Intent Not Available Full Title: Consulting Services for Feasibility Study For Millennium Library Parkade - 251 Donald Street. D4. SCOPE OF SERVICES D4.1 The Services required under this Contract shall consist of the following: (a) Obtain a Class 3 Cost Estimate for Option 2 of the short-term repairs at the parkade as outlined in the CKP report; and (b) Undertake a feasibility study to identify the best long-term plan for the parkade, including a review of options with the greatest cost/benefit to the City. (i) Investigate, analyze and validate asset development/redevelopment parameters, technical scope or design requirements forming input to an Option(s); (ii) Investigate, analyze and validate existing site conditions with respect to structures and supporting infrastructure including but not limited to services, utilities, communication network systems, as forming input to an Option(s); (iii) Investigate, analyze and confirm any systems that are shared with other City owned assets such as Millennium Library and Millennium Library Park; (iv) Investigate, analyze and validate pertinent matters concerning ownership, law and/or governance of the real property which comprises the Study subject site; (v) Delineation and documentation of environmental remediation requirements; (vi) Investigate, analyze and validate regulatory requirements forming input to an Option(s); (vii) Financial cost/benefit analysis; (viii) Consultation with Civic departments proposed for relocation to investigate, analyze and validate relocation metrics, and confirm feasibility; (ix) Consultation with other Civic stakeholders or parties potentially supplying information to the Study, in coordination with the Project Manager; (x) Quantification of Civic department consolidated operational efficiencies; (xi) Report Preparation. D4.2 For the Class 3 Cost Estimate, refer to City of Winnipeg Building and General Construction Industry - Class of Estimate Class 3 - Deliverable Maturity Assessment Checklist and Deliverable Definitions (Appendix B). D4.3 According to CKP Condition Assessment report (Appendix A) short term repairs include: (a) Structural - Option 1 which does not address the underlying cause(s) of the deterioration which will limit their durability and performance over the long term (not to be included in the Class 3 Estimate); (b) Structural - Option 2 which includes additional recommendations aimed at addressing the underlying causes of the deterioration and improving long term durability and this is the option that we would like used to prepare the Class 3 Cost Estimate; (c) Mechanical (i) Natural Gas Piping - Painting (this item has been completed) (ii) Fuel Oil Tanks - Seal Tapings (this item has been completed) (iii) Parking Booth Ventilation Addition for Office Spaces (iv) Addition of NO2 detection at all required locations (this item has been completed) (d) Electrical (i) Improved labeling for electrical equipment (ii) Creation of Single Line Diagram (iii) Emergency Generator - Battery Replacement (iv) Alarm System Replacement (Booth Only) D4.4 The feasibility study shall identify cost-effective investment options to address the short-term, medium- and long-term repairs required at the parkade. This study shall consider and assess the cost/benefit and viability of the following options: (a) to prolong the life of the parkade by undertaking all repairs outlined in the CKP report (i) packaged in what years each of the repairs should be undertaken with aim to minimize the amount of parkade closures during repair work. (b) to build a new parkade which would include decommissioning and demolishing the existing facility, and rebuilding a new parkade that will be used for parking purposes but allows for future repurposing for non-parking purposes. (c) to close the parkade and consider what to do with any shared systems; (d) to sell the parkade and consider what to do with any shared systems; or D4.5 All options in the feasibility study should be at a Class 4 Cost Estimate. (a) For the Class 4 Cost Estimate, refer to City of Winnipeg Building and General Construction Industry - Class of Estimate Class 4 - Deliverable Maturity Assessment Checklist and Deliverable Definitions (Appendix C). D4.6 Additional information may be made available by the City of Winnipeg, for use by the Consultant, upon award of Contract. D4.7 Level of Service should be considered in the feasibility study. D4.8 The funds available for this Contract are $100,000.00 D4.8.1 The Services required under D4 shall be in accordance with the City's Project Management Manual Notwithstanding the foregoing, the Consultant is being engaged by the City for its professional expertise; the Consultant shall bring to the Project Manager's attention any aspect of the City's Project Management Manual or templates which the Consultant is of the opinion is not consistent with good industry practice. D4.9 The following shall be included in the Class 3 estimate and feasibility study in relation to costs associated with: (a) City of Winnipeg Green Building Policy: New City-Owned Buildings and major additions (b) Universal Design Policy (c) City of Winnipeg Climate Action Plan (d) OurWinnipeg Initiative The method of Contractor Selection has not been Determined at this time. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Parking Garage

$100,000.00

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
6
Bidding Soon
212
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2022

img_map_placeholder

251 Donald St, Winnipeg, MB


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.