Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Lake Mills, Iowa. Completed plans call for site work for a golf course; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The extent of the work involved is the Construction of miniature golf course; including, but not limited to the following: Preparation of subbase, PCC sidewalk with subbase, 18-hole miniature golf course with 9 holes meeting ADA requirements and a practice hole, associated features for the golf course, site restoration, and miscellaneous associated work, including cleanup. The Proposal shall be made out on the form furnished by the City of Lake Mills and obtained from WHKS & Co., Engineers, Planners, and Surveyors, and must be accompanied in a sealed envelope by either: (1) a certified check, or a cashier's check drawn on an Iowa bank, or a bank chartered under the laws of the United States, in an amount of 5% of bid amount; or (2) a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount of 5% of bid amount; or (3) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of 5% of bid amount. The bid security shall be made payable to the City Clerk of the City of Lake Mills, Iowa. The bid security must not contain any conditions either in body or as an endorsement thereon. The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into contract within ten (10) days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and the other contract documents. The City will accept bid bond forms that meet the Requirements of Iowa Code, Section 26.8. Contractors and subcontractors shall not include sales tax for material purchases. At the time of the contract acceptance by the City Council, the prime contractor and all subcontractors will be issued a certificate of exemption. Bidders shall not be permitted to withdraw their bids for a period of thirty (30) days after the same are opened. Bidders will be required to complete a Bidder Status Form from the Iowa Department of Labor regarding the Contractor's resident status within the State of Iowa. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. The Contractor shall commence work after the Notice to Proceed is issued and shall be completed on or before September 29, 2023. Payment to the Contractor for said Project will be made in cash derived from the proceeds of the issuance of bonds as may be legally used for such purposes, governmental grants and/or from cash on hand. Any combination of the above methods of payment may be used at the discretion of the Owner. The Contractor will be paid each month ninety-five (95) percent of the Engineer's estimate of the value of acceptable work completed at the end of the preceding month. Final payment will be made in accordance with Iowa Code chapters 26 and 573, as amended. No partial or final payment will be due until the Contractor has certified to the City that the materials, labor and services involved in each estimate have been paid for in accordance with the requirements stated in the specifications. The successful bidder will be required to furnish a bond in an amount equal to one hundred (100) percent of the contract price, said bond to be issued by a responsible surety approved by the Owner and which shall guarantee a faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all materials and labor and protect and save harmless the Owner from claims and damages of any kind caused by the operations of the Contractor and shall also guarantee the maintenance of the improvements constructed for a period of two (2) year(s) after completion and acceptance by the Owner. Plans and specifications governing the construction of the proposed improvements have been prepared by WHKS & Co., Engineers, Planners, and Surveyors, which plans and specifications and the proceedings of the Owner referring to and defining said proposed improvements are hereby made a part of the Notice by reference, and the proposed contract shall be executed in compliance therewith. Copies of said plans and specifications are now on file with the City Clerk and at the offices of WHKS & Co., and may be examined by the bidders.
Post-Bid
Golf Course
$225,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 14, 2022
July 14, 2022
S Lincoln St, Lake Mills, IA
Related To This Project
Lake Mills, IA
Bid Date: Dec 15 2020
Lake Mills, IA
Bid Date: Sep 15 2020
Lake Mills, IA
Bid Date: Apr 16 2024
Lake Mills, IA
Bid Date: Apr 11 2024
Lake Mills, IA
Bid Date: Aug 20 2024
Lake Mills, IA
Bid Date: Nov 09 2023
Lake Mills, IA
Bid Date: Dec 14 2022
Lake Mills, IA
Bid Date: Feb 07 2023
Humboldt, IA
Bid Date: Jun 11 2020
Waukee, IA
Bid Date: Dec 12 2018
Urbandale, IA
Bid Date: Feb 07 2019
Norwalk, IA
Bid Date: Feb 27 2019
Grimes, IA
Bid Date: Apr 11 2019
Hospers, IA
Bid Date: Nov 27 2018
Ames, IA
Bid Date: Mar 21 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.