BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Key West Naval Air Station, Florida. Design plans call for site work for a water / sewer project.

As of December 20, 2023, an engineer has been selected and this project is in design. Further details regarding design and construction have not been identified. A firm timeline for construction has not been established. A detailed scope has not yet been released. *The closed solicitation has been included below for reference: The purpose of this RFQ is to select consultant team to provide detailed engineering design services for trenchless installation of utilities beneath Fleming Channel, from Trumbo Point Annex to Fleming Key, including drawings, specifications, installation method procedures, utility connections, equipment specification, and cost estimates. These services and the required qualifications include, but may not be limited to, the following: o civil engineering design o bidding package development o construction cost estimation o subsurface exploration and geotechnical evaluation services It shall be the responsibility of the consultant team to produce and complete plans and specifications for the design and engineering of Trenchless Installation of Utilities Across Fleming Channel, in addition to providing bidding documents, construction cost estimate, work zone traffic control plans, and provide plans and information to coordinate with and obtain federal, state, and local agency permits. During construction, consultant team shall be available to advise on significant omissions and material substitution requests. Project makes use of the microtunneling trenchless installation method for installing a 72-inch steel casing for placement of (1) 30-inch ductile iron pipe sanitary sewer, (1) 24-inch steel casing for the 12-inch reclaimed water line, (1) 18-inch steel casing for the eight-inch water line, and (4) four-inch electrical conduits. Consultant team shall prepare preliminary design reports and cost estimates for the 60% and 100% detail design level and complete final detailed design and bidding documents. Detailed scope of work encompasses specification of the microtunnel boring machine (MTBM) with slurry supply and recovery system, soil separation plant, operations power supply, and laser direction controller; access shaft construction for tunneling operations including type, locations, size, depth, and construction method and notation to groundwater table challenges; utility connection vaults, pipeline extensions and materials and methods for making connections. Scope of work includes development of the work plan that will incorporate safety protocols and best management practices (BMPs) for safe operations and environmental protection. City is conducting the environmental review, permitting, and easement for the microtunnel design and construction project. Geotechnical site investigation was completed, including two standard penetration test borings to 40-foot depth and two standard penetration test borings to 75-foot depth. Boring planned for Fleming Key Channel was abandoned due to inability for locate contractor to perform the work. Permit authorization for the in-water boring has been obtained. Consultant team may carry out and complete this boring. The City of Key West reserves the right, at its sole discretion, to accept or reject any and all responses and to waive informalities or irregularities when it is in the best interest of the City The method of contractor selection has not been determined at this time.

Design

Water / Sewer

$400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
12
Bidding Soon
147
All Active Projects
68
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 4, 2024

January 31, 2024

img_map_placeholder

Multiple Locations, Key West Naval Air Station, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.