Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a multi-residential development in State College, Pennsylvania. Completed plans call for the renovation of a multi-residential development.
**As of April 7, 2022 , an award has not yet been made. A timeline for award are expected within two weeks.** The project rehabs 8 townhomes at 803-817 Old Boalsburg Rd. State College. Bids will be accepted for 3 separate contracts: 1) HVAC-ductwork, replace furnace systems with heat pumps 2) Electrical-update systems 3) Renovations-renovate kitchens/baths, replace doors/windows/flooring/ceiling, insulate This project uses federal HOME funds and is subject to all related Federal regs. PA State prevailing wages will apply. The contract documents contain requirements for wage rates, labor standards, nondiscrimination in employment, goals for participation by minority & women (MBE/WBE) businesses, and by Section 3 residents/businesses, and related matters. All contractors and subcontractors working on this project will be required to comply with the PA Human Relations Act No. 222. The Owner does not discriminate based on actual or perceived race, color, religion, age, ancestry, national origin, place of birth, sex, sexual orientation, gender identity or expression, source of income, disability or handicap, presence of a service animal (public accommodations) or support animal (housing and real estaterelated transactions), pregnancy, birth of a child or marital or familial status. Bids shall remain irrevocable for 60 days after the date of the Bid Opening or risk forfeit of the bid surety. The Owner may hold all bids for 60 days before making an award unless award is delayed due to funding agency requirements; in which case, bids shall be irrevocable for 120 days per Act 317 of 1978, as amended. BOROUGH OF STATE COLLEGE Thomas J. Fountaine, II Borough Manager W00000000 Publication Dates Bidders shall certify that they are not debarred from participating in state and federally funded contracts. Bidders must provide, concurrently with the Bid, security in the amount, form and subject to the conditions provided in the Information for Bidders, as well as Section 3 Utilization and MBE/ WBE contacts and commitments. Performance and payment bonds in 100% of the contract amount are required. The Owner reserves the rights to reject any or all bids, to waive any defects, errors, omissions, irregularities or informalities in a bid or the bidding procedure, and to accept any bid, which it may deem to be for or in its best interest. Bid Results :: Electrical Rehab :: PBCI-Allen Mechanical & Electrical State :: $80,592.00 HVAC Rehab :: PBCI-Allen Mechanical & Electrical :: $157,856.00 Renovation :: Yoder Builders, Inc. :: $634,800.00
Bid Results
Multi-Residential
$873,248.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2022
April 30, 2022
803 Old Boalsburg Rd, State College, PA
Related To This Project
State College, PA
Bid Date: Mar 01 2022
State College, PA
Bid Date: Mar 22 2022
State College, PA
Bid Date: May 17 2022
State College, PA
Bid Date: Jun 20 2022
State College, PA
Bid Date: Jul 01 2022
State College, PA
Bid Date: Sep 29 2023
State College, PA
--
State College, PA
--
State College, PA
Bid Date: Dec 06 2021
State College, PA
Bid Date: Dec 06 2021
State College, PA
Bid Date: Mar 08 2022
State College, PA
Bid Date: Mar 10 2022
State College, PA
Bid Date: Mar 21 2022
State College, PA
Bid Date: Mar 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.