BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Burien, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

The 1st Avenue S Watermain Replacement Phase 2 project involves the replacement of existing water mains in King County north of the City of Burien and consists of (2) schedules (A and B). Schedule A is the base bid and includes the installation of approximately 4,020 LF of 12" DI watermain and roughly 400 LF of 8" DI watermain to replace existing pipes in: 1st Avenue S. from S. 116th Street to S. 108th Street, and S. 108th Street from 1st Avenue S. to 4th Avenue SW. Schedule B is the alternate added Bid and involves the installation of approximately 2,000 LF of 8" DI to replace existing pipes in S. 112th Street from 1st Avenue S. until it dead-ends after 4th Avenue S. The specific location of the proposed facilities to be replaced is shown on the construction plans. The overall project also includes the installation of fire hydrant assemblies, multiple connections to the existing system and the replacement and reconnection of existing services. Also included as part of the work is the construction of rockeries and restoration work involving trench patching, grind and overlay, curb and sidewalk replacement, striping, traffic loop replacement, general restoration, as well as erosion control and traffic control. Subject to time lost due to inclement weather and delay in delivery of materials, should such delay not be the result of the undersigned's actions, the undersigned agrees to complete the entire project (Schedule A and B) within two hundred and forty (240) calendar days, beginning with the tenth (10th) calendar day after the date of written Notice to Proceed with the Work. In the event that only Schedule A of the project is awarded, the work for Schedule A must be completed within one hundred and sixty (160) calendar days.

Bid Results

Water / Sewer

$2,531,601.00

Public - County

Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
31
Bidding Soon
861
All Active Projects
364
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.