BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cookeville, Tennessee. Working plans call for site work for a water / sewer project.

**As of 3/28/2022 There was only 1 bid and it was out of budget. I am not sure what the owner will want to do at this time. Each bid must be accompanied by a certified check of bidders bond executed by the bidder and a surety company licensed to do business in the State of Tennessee, for the sum of five percent (5%) of the amount bid. The successful bidder will be required to execute a Performance Bond in the amount of One Hundred (100%) of the contract price. Bonds must be accompanied by Power of Attorney. No bid may be withdrawn for a period of thirty days (30) after the date set for the opening of bid. All bidders must be licensed contractors as required by Chapter 135 Public Acts of 1945 of the General Assembly of the State of Tennessee, Section 1. Bidders name and license number must be placed on the Bid Envelope Cover containing his bid and bond. The Contractor shall be responsible for verifying and maintaining documentation that all construction forces that are on all construction sites have met the State of Tennessee Background Check. Highlands Residential Services reserves the right to reject any or all bids and waive informalities therein. The Bid Envelope Cover Sheet must be completely filled out. Any bids received with Bid Envelope Cover Sheet omissions will be returned to the bidder unopened. Any Bids received after the scheduled closing time for the receipt of bids will be returned unopened. It is hereby understood and mutually agreed by and between the Contractor and the Owner that the date of beginning and the time for completion of the work to be done hereunder are essential conditions of the contract; and it is further mutually understood and agreed that the work embraced in this contract shall be commenced immediately upon notice to proceed and shall be completed within 60 days. The Contractor agrees that said work shall be executed regularly, diligently, and uninterruptedly at such rate of progress as will ensure full completion thereof within the time specified. If the Contractor shall neglect, fail or refuse to complete the total work within the contract time or any proper extension thereof granted by the Owner, the Contractor shall be liable for all such actual damages sustained by the Owner as the result of each delay, except that when such actual damages may be difficult to ascertain, the Contractor shall pay the Owner the sum of $200.00 per day as liquidated damages of each and every calendar day that the Contractor shall be in default after the time stipulated for completion of the work. In no event shall such payment be construed as a penalty but shall be considered as reimbursement for the Owners additional expense and loss occasioned by unexpected Contractors delay. Delays occasioned by strike occurring on the job during the performance of the work, riots, civil commotions, change orders, and such other justifiable delay as may be approved by the Owner and the Architect pursuant to the provisions of the General Conditions, shall be the only exceptions for which a request for excusable cause shall be made in writing to the Owner no more than 21 days after the delay begins. Otherwise, such claim shall be waived, and the work shall be completed without extension for such delay.

Final Planning

Water / Sewer

$300,000.00

Public - City

Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
20
Bidding Soon
688
All Active Projects
291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2022

September 28, 2022

img_map_placeholder

861 Willow Valley Ct, Cookeville, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.