BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and renovation of a mixed-use development in Birmingham, Alabama. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The general scope of the work includes but is not limited to: Renovation of an existing 6-story warehouse building in downtown Birmingham to become offices, meeting spaces and classrooms for the College of Architecture, Design & Construction's Urban Studio and the Harbert College of Business's outreach and training components. Work involves restoration of exterior facades (terra cotta and brick masonry); installation of new envelope components (roof, windows, lobby storefront, etc); Full MEP re-work, and Tenant fit-out of 6 floors, totaling ~41,000 GSF. In accordance with Code of Alabama, 39-2-2(a), prequalification is required for this project. For all questions or inquiries about this project, please contact: Mary Melissa Taddeo, marymelissa.taddeo@auburn.edu; 334-758-1235 A certified check or bid bond payable to Auburn University in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000.00, must accompany the bidder's proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract.

Occupancy

Warehouse / Distribution

$10,395,000.00

Public - City

Demolition, Renovation, Site Work

172

34

114

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
26
Bidding Soon
543
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

June 6, 2022

img_map_placeholder

2013 4th Ave N, Birmingham, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.