BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Mobile, Alabama. Conceptual plans call for site work for a transportation facility; and for paving for a transportation facility.

The Mobile Airport Authority is hereby soliciting Statement of Qualifications from consultants for airfield development projects that are anticipated to occur within the next five (5) years at St. Elmo Airport (2R5) in Mobile County, AL west of St. Elmo, AL. Subject to receipt of Federal funding and/or State of Alabama funding, these projects may include the following: 1. FY2022 - Design Services Needed to Update ALP $100,000+/- 2. FY2023 - Apron Rehab & Expansion $315,000 3. FY2024 - Access Roads & Entrance $1.2M 4. FY2025 - Runway, Taxiway, & Taxilane Rehab $400,000 5. FY2026 - Runway, Taxiway, & Taxilane Rehab $400,000 The services to be provided may include preliminary design, final design, land planning, bidding, construction observation, and incidental special services such as geotechnical/subsurface investigations and topographic surveying. A qualification-based selection process conforming to FAA Advisory Circular 150/5100-14E Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects will be utilized to select a consultant. Fee information will not be considered in the selection process and shall not be submitted with the Statement. Fees will be negotiated as Federal funds become available. The agreement(s) between the Sponsor and the selected consultant will be subject to all applicable Federal Rules and Regulations as identified in AC 150/5100-14E. The Disadvantaged Business Enterprise (DBE) percentage will conform to the anticipated goal established for this project in the full RFQ. Statements must be concise and contain no more than thirty (30) pages of material. This excludes the front and back covers, the two-page cover letter, table of contents, and section dividers. Statements received after this deadline will not be considered. The Mobile Airport Authority reserves the right to reject any and/or all Statements. Submittals will become property of the Mobile Airport Authority.

Conceptual

Transportation Terminals

$2,415,000.00

Public - City

Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
33
Bidding Soon
486
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

img_map_placeholder

Multiple Locations, Mobile, AL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.