BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Site work and paving for a bridge / tunnel in Thornton, Colorado. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project provides a 100-year crossing at Washington Street for the Grange Hall Creek South Tributary per the Master Plan. Currently, the roadway overtops in the 10-year event and the culverts are being undermined and clog frequently. This will also provide additional detention upstream of Washington St to remove properties downstream from the floodplain. The City and Mile High Flood District (MHFD) have entered an agreement to partner on the design of this project. MHFD will be the design and construction lead, and provide funding participation. Design and permitting began in early 2024. Also in 2024, outside utilities, including Denver Water, will be asked to relocate their facilities ahead of the culvert construction. Construction is anticipated to begin in 2025. 2024 and 2025 Funding matches MHFD's future year model. As of August 18, 2025, this project is included in the City of Thornton's Fiscal Year 2025-2029 Capital Improvement Plan. Further information regarding a design firm and timeline for construction has not yet been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$1,500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

Project location map

Grange Hall Creek Trail, Thornton, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.