Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Chula Vista, California. Completed plans call for the renovation of a municipal facility.
The County of San Diego (County) is requesting proposals (Proposal) from firms qualified to provide Construction Manager at Risk services for the preconstruction and construction phases of Hcd Town Centre Manor Major Systems Upgrade The purpose of this project is to upgrade major accessibility, mechanical, electrical, plumbing, and Life Safety systems at the Town Centre Manor building owned by Housing and Community Development Services. The building is a residential facility constructed in 1985 and contains 59 one-bedroom occupied apartments. This project consists of site accessibility improvements, interior accessibility and egress improvements, elevator modernization, replacement of existing major mechanical, electrical, plumbing, and Life Safety systems, and installation of a new fire sprinkler system. The site improvement scope generally consists of ADA parking, main entrance, and walkway accessibility improvements; it also includes minor improvements at exterior stairways. Interior accessibility improvement scope generally includes signage, hardware, and code-driven equipment mounting modifications. Interior egress improvement scope includes modifications to existing interior egress stairwells. Elevator modernization scope includes replacement of elevator controls and finishes, and installation of elevator emergency operations interface. Major mechanical, electrical and plumbing systems replacement scope includes replacing the existing domestic hot water boiler and various existing electrical infrastructure. These electrical equipment replacements include the building meter and distribution board, existing panelboards, transfer switch, and unit load centers. Critical Life Safety system upgrades include replacement of the building fire alarm system, replacement of the unit smoke detectors, and installation of a building fire sprinkler system. Full fire alarm and fire sprinkler design and permitting shall be prepared per the Project Manual by subcontractor(s) to the CMAR after the preconstruction phase. Permit drawings shall be submitted by the CMAR as a deferred submittal to the Authority Having Jurisdiction for this property - City of Chula Vista. The Contracting Officer for this solicitation is Martha F Trevejo, Procurement Contracting Officer, Martha.Trevejo@sdcounty.ca.gov Questions due March 18, 2022 prior to 5:00 p.m, Oral explanations or responses to Questions will not be binding upon the County. The site improvement scope generally consists of ADA parking, main entrance, and walkway accessibility improvements; it also includes minor improvements at exterior stairways. o Interior accessibility improvement scope generally includes signage, hardware, and code-driven equipment mounting modifications. Interior egress improvement scope includes modifications to existing interior egress stairwells. o Elevator modernization scope includes replacement of elevator controls and finishes, and installation of elevator emergency operations interface. o Major mechanical, electrical and plumbing systems replacement scope includes replacing the existing domestic hot water boiler and various existing electrical infrastructure. These electrical equipment replacements include the building meter and distribution board, existing panelboards, transfer switch, and unit load centers. o Critical Life Safety system upgrades include replacement of the building fire alarm system, replacement of the unit smoke detectors, and installation of a building fire sprinkler system. Full fire alarm and fire sprinkler design and permitting shall be prepared per the Project Manual by subcontractor(s) to the CMAR after the preconstruction phase. Permit drawings shall be submitted by the CMAR as a deferred submittal to the Authority Having Jurisdiction for this property - City of Chula Vista. If the DVB Subcontractor Participation Plan does not show that Offeror has met or exceeded the 3% DVB Subcontractor Participation goal, Offeror must provide Documentation of a Good Faith Effort.
Post-Bid
Municipal
$4,234,118.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 27, 2022
September 28, 2022
434 F St, Chula Vista, CA
Related To This Project
Chula Vista, CA
Bid Date: Jun 30 2022
Chula Vista, CA
Bid Date: Mar 28 2022
Chula Vista, CA
Bid Date: Mar 25 2021
Chula Vista, CA
Bid Date: Nov 24 2020
Chula Vista, CA
Bid Date: Sep 24 2020
Chula Vista, CA
Bid Date: May 20 2022
Chula Vista, CA
Bid Date: Jun 23 2022
Chula Vista, CA
Bid Date: Jun 08 2021
Chula Vista, CA
Bid Date: May 17 2022
Chula Vista, CA
Bid Date: Jun 15 2022
Chula Vista, CA
Bid Date: Jun 01 2022
Chula Vista, CA
Bid Date: Oct 09 2019
Chula Vista, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.