Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, asbestos abatement and renovation of an educational facility in Greeley, Colorado. Completed plans call for the renovation of a 17-story above grade educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.
Lawrenson Hall is a 17 story residence hall located on the west campus of the University of Northern Colorado. The project consists of the removal of asbestos containing drywall to allow for the removal and replacement of drain and vent plumbing stacks per Contract Documents prepared by Owners Representative, RLH Engineering, Inc. Note: Contractors are required to be listed on the most current Colorado Department of Public Health and Environment (CDPHE) list of Colorado General Abatement Contractors . The University of Northern Colorado will not allow any certified Colorado General Asbestos Abatement Contractors that are listed on the most current CDPHE Asbestos Enforcement Cases list with a Case Finding of Guilty in any state building or residence hall. General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % The work includes the removal and disposal of asbestos containing acoustical ceiling texture to be removed from concrete substrate. Where drywall ceilings and walls exist, the work includes the removal and disposal of texture containing drywall. Remove all ceiling texture and residue from concrete, including pits, form lines, and other variations in the concrete surface. Remove all drywall, including fasteners, leaving clean stud framing. Clean all dust, debris, and texture overspray from exposed stud cavities. If ceramic tile is adhered to drywall within the extent of removal, remove and dispose of ceramic tile as ACWM. Batt insulation within wall cavities shall be removed and disposed of. All piping and closed-cell rubberized foam pipe insulation shall be cleaned and left in place. The work includes the removal and disposal of lead-containing ceramic tile flooring to be removed during asbestos removal in a common abatement Work Area, and shall be disposed of with other ACWM. Removal includes only ceramic tile, grout adhesive does not need to be removed. OSA-AFB-1 REV 7/2021 Minimum Requirements Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. To be considered as qualified, interested firms shall have, as a minimum: 1. Provided General Contracting services within the last three (3) years for at least two (2) projects each in excess of $275,000.00 (hard costs), utilizing the expertise present in their Colorado Office; and 2. Demonstrated specific General Contracting experience in projects of similar scope and complexity; and 3. Demonstrated bonding capability up to $300,000.00 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity. Firms meeting the minimum requirements may obtain the bidding documents from Jimmy Mock at jimmy.mock@unco.edu Question Acceptance Deadline 03/14/2022 07:00 PM EDT Questions are submitted online No
Award
Educational
$203,261.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 23, 2022
April 22, 2022
2300 12th Ave Ct, Greeley, CO
Related To This Project
Greeley, CO
Bid Date: May 12 2022
Greeley, CO
Bid Date: Apr 21 2022
Greeley, CO
Bid Date: May 19 2022
Greeley, CO
Bid Date: May 19 2022
Greeley, CO
Bid Date: Apr 28 2022
Greeley, CO
--
Greeley, CO
--
Greeley, CO
--
Greeley, CO
Bid Date: Apr 11 2022
Greeley, CO
Bid Date: Mar 28 2022
Greeley, CO
Bid Date: May 05 2022
Greeley, CO
Bid Date: May 05 2022
Greeley, CO
Bid Date: May 05 2022
Greeley, CO
Bid Date: May 02 2022
Greeley, CO
Bid Date: Apr 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.