BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 6, 2022 at 8:00 PM

Updated October 24, 2023

Renovation of a water / sewer project in Tallahassee, Florida. Completed plans call for the renovation of a water / sewer project.

As of October 6, 2022, the project has been awarded. A timeline for construction has not been confirmed. The work to be performed under this Contract generally includes furnishing of all labor, equipment, materials, tools and services required to replace, test, and start up the proposed biogas blowers and moisture accumulators system. The specific areas of work generally include, but are not limited to the items listed below, along with associated piping, valves, support systems and appurtenances, structural, painting, electrical, instrumentation, tie-ins to existing systems, and testing: Demolition activities, e.g. existing equipment, piping, and concrete as shown in the plans Construction of new support structure and assemblies Installation of new mechanical equipment, controls, and auxiliary assemblies as shown in the plans Electrical work Programming and Integration of new equipment and SCADA Training plant personnel on operation and maintenance of system Final Completion shall be achieved within 300 calendar days from Notice to Proceed. The Period of Performance provided in the Statement of Work is an estimate of when the project/contract will occur. The actual period of performance dates will be discussed and determined with the successful Contractor. Bidders are responsible for familiarizing themselves with the specifications of the products to be delivered and/or the work to be performed under this Bid. Bidders should inspect any equipment and/or locations prior to submitting a bid in order to be fully aware of the scope of services required. Failure to inspect the various sites will not relieve the successful Bidder s responsibility from performing in accordance with the intent and meaning of the specifications at the awarded prices. 5% Aggregate for MBE and WBE Participation *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$1,060,000.00

Public - City

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
36
Bidding Soon
584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2022

April 25, 2022

Project location map

4505 Springhill Rd, Tallahassee, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.