BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Shreveport, Louisiana. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Construction is expected to begin in early 2024, with estimated completion in late 2028. As of March 2024, construction has not started. Construction was supposed to start in August 2022 but the anticipated start date now is mid 2024 with completion of the project expected in early 2027. James Construction Group, LLC has been awarded the project. The design build firm will be responsible for completion of the project documents, sub bidding and project timeline. This proposed project, estimated to cost approximately $150 million, will construct a new four-lane bridge across the Red River connecting Bossier and Caddo parishes. Using the design-build delivery method will allow the chosen contractor to collaborate with local and state officials during the course of the project. There is the potential for the old bridge to be rehabilitated to provide a linear park connecting the existing bicycle and pedestrian trails on either side of the Red River. Additionally, LA 511 (Jimmie Davis Hwy.) will be reconstructed from the east end of the Jimmie Davis Bridge to U.S. 71 (Barksdale Blvd) into a four-lane, median-divided highway, providing a full access interchange between LA 511 and Arthur Ray Teague Parkway. This project is fully funded through allocations from the bridge preservation funds, state bonds and the American Rescue Plan Act passed by Congress in 2021. This proposed project, estimated to cost approximately $150 million, will construct a new four-lane bridge across the Red River connecting Bossier and Caddo parishes. Type Improvement : Replacement\rehabilitation (Hbi) Length : 1.80 miles Parish : Bossier, Caddo Estimated Cost Range : $125,000,000 to $150,000,000 LADOT - Jimmie Davis Bridge (La 511) (Hbi) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$361,700,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
39
Bidding Soon
600
All Active Projects
311
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 6, 2024

January 18, 2027

img_map_placeholder

LA-511, Shreveport, LA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.