Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, renovation and addition to a transportation facility in Windsor Locks, Connecticut. Working plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.

The Connecticut Airport Authority (CAA) is soliciting a qualified Construction Manager at Risk (CMR) firm to provide design and construction services for the Vertical Circulation Improvement Project at Bradley International Airport (BDL). The Vertical Circulation Improvement Project encompasses two large scale building additions at the east and west ends of BDL Terminal A. The completed project will include approximately 20,200 square feet (sf) of horizontal addition and 4,500 sf of interior renovation that will span the Arrivals Level, Departures Level, and Mezzanine Level on the northwest side of Main Terminal A. Each addition will contain two new elevators and escalators in order to increase vertical circulation amenities at the terminal. All respondents, including any and all persons acting on their behalf, are strictly prohibited from contacting any employee of the CAA, Board official or Consultant, on or regarding any matter relating to this RFQ from the time the RFQ is issued until award other than the CAA Purchasing Agent via e-mail only at procurement@ctairports.org. The CAA reserves the right to disqualify any Proposer who contacts any employee of the CAA or Board official, other than the Purchasing Agent, concerning this RFQ. Questions concerning this RFQ are due no later than 1:00 p.m. (EST), March 23, 2022 By submitting a proposal, the firm certifies that it has fully read and understands the RFP, has full knowledge of the scope of work to be provided, and accepts the terms and conditions under which the services are to be performed.

Final Planning

Transportation Terminals

$300,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
990
Active Projects
418
Bidding Soon
6,549
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2022

August 1, 2022

Project location map

Schoephoester Rd, Windsor Locks, CT


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed