BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2022 at 8:00 PM

Updated January 25, 2024

Site work and paving for a road / highway in Chicago, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Fullerton Avenue Improvements - Narragansett Avenue to Lockwood Avenue (MBI-1) Deadline for Questions 11-Mar-2022 16:00:00 CONTRACT SPECIFIC GOALS: 26%MBE; 6% WBE and 1% VBE The work consists of furnishing all labor, materials and equipment required for the streetscape and safety improvements of Fullerton Avenue from Narragansett Avenue to Lockwood Avenue. This includes but is not limited to the following activities: asphalt surface removal, full-depth removal of existing roadway pavement, sidewalk removal, driveway pavement removal, concrete curb and gutter removal, excavation, granular sub-base, P.C.C. base course, HMA binder and surface course, combination concrete curb and gutter, concrete sidewalk, ADA sidewalk ramps, P.C.C. driveway pavement, pedestrian refuge islands, catch basin and sewer lateral replacement, adjustment of existing drainage and utility structures, new street lighting, painting existing traffic signal equipment, topsoil, sodding, new parkway trees, signage, and pavement markings; as escribed in the detail specifications, including all appurtenant work and accessories, to the complete satisfaction of, approval and acceptance by the City.

Award

Roads / Highways

$8,586,411.00

Public - City

Paving, Site Work

180

15

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
465
Active Projects
256
Bidding Soon
3,392
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2022

May 19, 2022

Project location map

W Fullerton Ave, Chicago, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.