BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Geneseo, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work of this single bid project includes construction of new water mains on College Drive and College Circle. Construction of new sanitary sewers on College Drive and College Circle. Construction of new storm sewers on College Drive and College Circle. Removal and replacement of existing above grade and below grade (in tunnel) steam and condensate lines including all insulation, pipe jacketing, restraints, guides, and supports. Repair of above grade concrete supports for reuse. Below grade steam work shall include the removal of the tunnel top slab, preservation of the walls and replacement of the cast-in-place top slab and application of waterproofing, backfill, and restoration. Other restoration and replacement consist of landscaping, plaza & sidewalk hardscape and new site pole lighting. In accordance with State Finance Law 139-j, all non-technical inquiries regarding this procurement must be directed to Robbilee Luedtke at SUCF.ConstructionBids@suny.edu or for MWBE related issues, Scott Clay at SUCF.OpportunityAdmin@suny.edu . Contact made to other staff regarding this procurement may disqualify the firm and affect future procurements with government entities in the State of New York EEO goals for this project: 6% minority workforce and 3% female workforce Contract term: 579 calendar days after receipt of the Notice to Proceed Minority Owned Sub-Contracting Goal: 10% Women Owned Sub-Contracting Goal: 5% Service-Disabled Veteran-Owned Business Contracting Goal: 3% Estimated Range- $5,000,000 - $10,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor shall complete all work necessary for substantial completion within 579 calendar days from receipt of the Notice to Proceed.

Award

Roads / Highways

$6,450,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
99
Bidding Soon
1,150
All Active Projects
571
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2022

January 30, 2023

img_map_placeholder

1 College Cir, Geneseo, NY


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.