Renovation of a detention facility in Ypsilanti, Michigan. Design plans call for the renovation of a detention facility.

As of September 29, 2022, an design firm has been selected for the project. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: PROJECT DESCRIPTION/SERVICES REQUESTED This project will replace the existing boilers in the Power Plant Building. The scope should include an assessment of the existing steam load to appropriately size the new boilers. The existing boilers date from the 1990s and were sized for the chillers, so are likely over-sized. There is currently no chart data for the facility. The assessment should include a condensate study in addition to the load calculation study. The Power Plant Building is located outside the secure perimeter of WHVCF. Please include the following in your proposal: o Design Review Meetings to be held at 50% and 90% reviews for Phase 400 and Phase 500 and as the PSC deems necessary. Microsoft TEAMS meetings are acceptable. The PSC shall be responsible for running construction progress meetings twice a month for the duration of the project, including a Pre-Construction meeting. o Please provide a probable cost estimate for the anticipated work o Work to include evaluation of existing data and condensate. o Two weeks review time is anticipated for each submission. o No multiple substantial completions are anticipated at this time. Please notify the Office of Design and Construction if you are having SIGMA VSS issues. Include your SIGMA ticket number in an email to our contract specialists, Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov ). You may be asked to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-bycase basis. Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible. NIGP CODES 90628; 90644; 91016; 92507; 92533; 92534 92567; 92578 and 92595 DESIRED SCHEDULE OF WORK Phase 400 and 500 should be completed no later than the end of May 2022 with the anticipated overall project completion (Phases 600 and 700) mid-autumn or before heating season. The professional shall submit a proposed work plan / schedule developed to achieve the desired completion as part of the proposal. ACCEPTING RFP QUESTIONS UNTIL: Friday, March 18, 2022, at 2:00 p.m. Eastern Please do not submit online questions via VSS. ALL questions should be emailed to Sheri Ananich at ananichs@michigan.gov LEIN Check (Department of Corrections ONLY) All contractor / vendor representatives attending Preproposal Walk Through Meeting must submit a Vendor / Contractor LEIN Request form five business days prior to the meeting date (See the attached Vendor/Contractor LEIN Request Form). Send the LEIN Request form, filled and signed, by email to Daniel T. Smith at email address: smithD76@michigan.gov . The email "Subject" must include (facility name, project name, date and time of Pre-Proposal Walk Through Meeting

Design

Jails / Prisons

$215,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
74
Bidding Soon
1,408
All Active Projects
572
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2023

img_map_placeholder

3201 Bemis Rd, Ypsilanti, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.