BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 28, 2022 at 8:00 PM

Updated March 20, 2024

Site work, paving and outdoor lighting for a road / highway in El Paso, Texas. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

Last Day for Offerors to Submit Written Questions March 16, 2022,Answers furnished during the conference will not be official until verified in writing by the issuing office. You may address questions to the Procurement Analyst, Derrick Russell in writing at russellhd@elpasotexas.gov .Any other communications, oral or in writing, with any person are strictly prohibited. The City reserves the right to accept or reject any or all proposals and to waive formalities. In case of ambiguity in stating the price proposal, the City reserves the right to consider the most advantageous construction thereof or to reject any proposals. Pebble Hills Blvd., Airport Dr., and Vista Del Sol Dr. renovations entails roadway illumination, landscape, and providing ADA accessibility. This project is described as Base Bids I, II, and III. Base Bid I consists of improvements along Pebble Hills Blvd. This includes the demolition of: existing pavement, concrete curb & gutter, sidewalks, ramps, and existing landscaping. Roadway improvements include: HMAC pavement, embankment, concrete sidewalks, curb and gutter, ADA ramps, signing and pavement markings, and proposed shrubs, trees & irrigation. Access to all properties must be provided during construction. Base Bid II consists of improvements along Airport Rd. This includes the demolition of: existing pavement, concrete curb & gutter, sidewalks, and existing illumination. Roadway improvements include: concrete sidewalks, illumination, and proposed shrubs, trees & irrigation. Access to all properties must be provided during construction. Base Bid III consists of improvements along Vista Del Sol Dr. This includes the demolition of: existing pavement, concrete curb & gutter, sidewalks, ramps, existing illumination, and existing landscaping. Roadway improvements include: HMAC pavement, embankment, concrete sidewalks, curb and gutter, ADA ramps, signing and pavement markings, illumination, and proposed shrubs, trees & irrigation. Access to all properties must be provided during construction. Alternate 1 consists of ITS conduit and ground boxes along Pebble Hills Blvd. Alternate 2 consists of ITS conduit and ground boxes along Vista Del Sol Dr.

Award

Roads / Highways

$5,492,201.00

Public - City

Outdoor Lighting, Paving, Site Work

258

16

2

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
11
Bidding Soon
231
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

May 30, 2022

Project location map

Multiple Locations, El Paso, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.