BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Shelton, Connecticut. Completed plans call for site work for a road / highway.

All questions must be emailed to Twig Holland, C.P.M., Acting Purchasing Agent: t.holland@cityofshelton.org Pavement Lines: Paint shall be applied by truck and include centerlines, lane lines and shoulder lines. Unless otherwise noted, the price shall be per linear foot (LF) of paint applied to the pavement. a. Centerlines shall be four inches (4") wide (single or double), white or yellow lines, and may include centerline tails on stop bars. For painted lines, the drop-on method of application shall be used, consisting of a combination of pigmented binder and glass spheres which, when properly applied, will provide a retrodirective reflecting marking for horizontal road surfaces. Single and double line bids shall be per linear foot. b. Skip lines shall be four inches (4") wide; white lines, consisting of a fifteen foot (15') segment and thirty foot (30') ship, except as directed by the City. On a street with more than one guideline, the sections shall line up approximately across the street. Skip lines shall be measured and priced per linear foot, only sections of pavement where markings are actually applied (not bare pavement) shall be included in the payment calculation. c. Pavement lane / edge lines shall be four inches (4"); white or yellow lines. Work that may be included are edge lines, shoulder lines, median lines, etc. Painted legends, arrows and markings: Paint shall be applied by a hand-striping machine. Markings shall include stop bars, arrows, parking stalls, crosswalks, curbs, and other miscellaneous applications. Unless otherwise noted, price shall be per square foot applied to the pavement. 1. Pavement Lines: Paint shall be applied by truck and include centerlines, lane lines and shoulder lines. Unless otherwise noted, the price shall be per linear foot (LF) of paint applied to the pavement. a. Centerlines shall be four inches (4") wide (single or double), white or yellow lines, and may include centerline tails on stop bars. For painted lines, the drop-on method of application shall be used, consisting of a combination of pigmented binder and glass spheres which, when properly applied, will provide a retrodirective reflecting marking for horizontal road surfaces. Single and double line bids shall be per linear foot. b. Skip lines shall be four inches (4") wide; white lines, consisting of a fifteen foot (15') segment and thirty foot (30') ship, except as directed by the City. On a street with more than one guideline, the sections shall line up approximately across the street. Skip lines shall be measured and priced per linear foot, only sections of pavement where markings are actually applied (not bare pavement) shall be included in the payment calculation. c. Pavement lane / edge lines shall be four inches (4"); white or yellow lines. Work that may be included are edge lines, shoulder lines, median lines, etc. a. Stop Bar Lines shall be a minimum twelve inches (12") wide; solid white lines, normally four feet (4') in advance of and parallel to the nearest crosswalk line. b. Turning Arrows on public streets shall be white and to dimensions specified by the City. c. Parking Stall Lines and Parallel Parking T-Bar lines shall be four inches (4") wide, solid white lines or the color specified by the City. d. Crosswalks utilizing parallel lines shall have a minimum six inches (6") wide white line to a maximum twenty-four inches (24") wide white line spaced not less than six feet (6') apart. Cross-hatching may be required in some cases. An alternate crosswalk specification of 16" wide bars or 24" wide bars at school/elderly crossings may be required by the City in compliance with State of Connecticut standards. e. Miscellaneous work may include but not be limited to bicycle path diamonds, stenciling, speed bumps, crosshatching, fire lanes, etc. f. Stenciling work shall include painting of numbers, words and symbols in the color directed by the City. g. Curbs shall be painted yellow or the color directed by the City and will be priced by the linear foot. h. Handicapped stencils will be priced per each. Locations- Shelton High School - Meadow St. a. On Meadow St. between William and Wheeler St. b. On Meadow St. near #151 Meadow 2. Elizabeth Shelton School - Willoughby Rd. a. Near #131 Willoughby Rd. b. On Willoughby Rd. just in from Soundview Ave. c. On Soundview Ave. in front of #226 Soundview Ave. d. On Soundview Ave between Birdseye Rd. Ext. and Maple Ave. Stain Lawrence School - Shelton Ave. a. In front of #10 Soundview Ave. Mohegan School - Mohegan Rd. a. Front of #20 Mohegan Rd. b. Mohegan Rd. near Hamilton Dr Booth Hill School - booth Hill Rd. a. Booth Hill near Federal Rd. b. Front of #571 Booth Hill Rd. Long Hill School - Long Hill Ave. a. Front of #539 Long Hill Ave. b. Near entrance to Wicke Health Care Intermediate School - Constitution Blvd. North a. Prior to the main entrance b. Prior to the exit Perry Hill School - Perry Hill Ave. a. East ofmain entrance b. West ofmain entrance

Post-Bid

Roads / Highways

$30,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
449
Active Projects
185
Bidding Soon
4,205
All Active Projects
1,814
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2022

May 6, 2022

img_map_placeholder

Multiple Locations, Shelton, CT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.