BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and addition to a mixed-use development in Robinson, Illinois. Completed plans call for the construction of a fitness / recreation center.

Plans call for the construction of a new gymnasium building of approximately 20,800 square feet and a fitness/wellness center addition of approximately 11,500 square feet. Please direct all bids/inquiries to the construction manager. Note from CM 4-28-2022: See attached revised architectural drawings for the Crawford County Recreation Center. Refer back to the specifications from the original bid. -Sealed Concrete floor everywhere in front building EXCEPT within Restrooms (same sealed concrete as previously bid) -Epoxy floor in all Restrooms/Showers (Same epoxy as previous bid) -Gymnasium Flooring-Sports Court in court area (same as previous bid) -Carpet in both 2nd floor Fitness Studio rooms (same carpet as base bid) -Sealed concrete walking track around perimeter of Gymnasium first floor -Base bid sealed concrete in Wellness Area with 1" sports floor as an alternate. -No bulkheads anywhere -No exterior concrete or kids playing surface area -Donor wall (Stickwood Material) will be removed from the project. Paint walls all one color.

Award

Educational

$3,700,000.00

Public - County

Addition, New Construction, Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
11
Bidding Soon
277
All Active Projects
121
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

June 27, 2022

img_map_placeholder

11220 IL-1, Robinson, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.