Site work and paving for a mixed-use development in Cottage Grove, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

Low Zone Raw Water Main Extension Improvements Phase 1 & 2. In general and pursuant to Minnesota Statutes, chapter 429, the work consists of the construction of water main improvements with approximately the following quantities: 8,600 LF 16" DIP Water Main 5,300 LF 20" DIP Water Main 10,500 LB Ductile Iron Fittings 1,100 SY Remove and Replace Bituminous Street 950 SY Remove and Replace Concrete Sidewalk 2,900 SY Remove Bituminous Trail Pavement 12,600 LF Silt Fence 18 AC Seeding and Hydraulic Matrix 7,200 CY Salvage Topsoil Borrow Along with all related work, appurtenances, erosion control and restoration. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. Direct inquiries to Engineer's Project Manager, Dave Sanocki, at (612) 712-2124 and dave.sanocki@stantec.com The Substantial Completion date is December 16, 2022. Substantial Completion includes placing all water main pipe, water main fittings, hydrants, curb/gutter, and bituminous patch. The Final Completion date is May 31, 2023. Final Completion includes, but is not limited to, final turf restoration and punch list work .The project shall be ready for Final Payment in accordance with Paragraph 14.07 of the General Conditions on or before June 16, 2023

Post-Bid

Water / Sewer

$520,000.00

Public - City

Paving, Site Work

64

19

4

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
100
Bidding Soon
1,700
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2022

April 25, 2022

Project location map

Multiple Locations, Cottage Grove, MN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed